Laserfiche WebLink
<br />LJ <br /> <br />-6- <br />~ocatron inn ircazion <br />INFORMATION CATEGORY NARRATIYE MAPS <br />2.05.3(3) Mine Facilities pN A <br />2.05.3(4) Ponds, Impoundments and <br />ENCLDSE~ /YIAP y <br />Diversions ~xKr8rT5 5 6 7 <br />2.05.3(5) Topsoil (removal and <br />storage ) ENCLASEA <br />2.05.3(6) Overburden <br /> PN~t <br />2.05.3(7) Coal Handling Structures ~AIA <br />2.05.3(8) Coal Processing Waste and <br />l P <br />i <br />~N~ <br />rocess <br />ng Waste <br />Non-Coa <br />2.05.3(9) Underground Development 9 <br />cA <br />E <br />)C <br />Waste ,~1 <br />A <br />5 <br />2.05.3(10) Return of Coal Processing <br />Waste to Abandoned ~~/~ <br />Workings <br />2.05.4 Reclamation Plan ENCLQSE~ <br />2.05.4 (2)(a) Timetables <br />~,~c~os~ <br />2.05.4(2)(b) Reclamation Cost Estlmatesl <br />ENC,~OSEA <br />2.05.4 (2)(c) Backfilling and Grading /y1f~p ~, aNi <br /> EaIC~OSEO MRP 3 Pa~HI <br />2.05.4(2)(d) Topsoil (Redistribution) ~A1CL-OSED MAP 2 <br /> MAP 3 <br />2.05.4(2)(e) Revegetation <br />~NecUS~ <br />M~ 3 <br />2.05.4(2)(f) Disposal of Debris, Acid- <br />OSF~ <br />E <br />lG' <br />Forming and 7ox1c-Forming n <br />L <br />Materials <br />B17 3 <br />a tz ~} <br />