Laserfiche WebLink
The report is contained in Addendum A, Suitability Evaluation of the Raton <br />Creek Mine Refuse Cover Materials. The analytical methods used in the <br />laboratory analysis and the results are presented in Exhibit 1, Results <br />of Laboratory Analysis, of the IME report. <br />~t <br />During mine reclamation, overburden will be stripped from the area between <br />the preparation plant and RntatCseckNo.1[vline portals, and used to reclaim the <br />portal area and some minor cuts near the shop building. From the cross-~ <br />sections and the post-mining topography map (Hap ]y), it is expected that <br />this amount to be moved is 22,000 cubic yards, which coincides with what <br />was originally excavated. <br />I f recl amati on were to take place i n the near future, the .Raton Creek No.2 Minc <br />area would also need to be backfilled. Thts is discussed in detail in <br />2.05.4 (2) (c) Backfilling and Grading. <br />459a Ret~srd 5/9~ <br />