<br /> <br />ID~ <br />• <br />JUN 19'98 10 41 No .008 P.03 <br />Activity Quatttiry Units l)nit Cost (:ost <br />I~. Settling pond <br />I. Place overburden, 12" on 2 acres <br />2. Place topsoil 12" on 2 acres <br />3. Sccd and mulch <br />3,227 <br />3,227 <br />2 <br />CV <br />CY <br />Acrcs <br />$1.25 <br />$1.25 <br />$800 <br />$4,034 <br />$4,034 <br />$1,600 <br />G. Lake shore final grade seed artd mulch <br />1. Kcplacc topsoil - 12" on 3 acres <br />2. Sccd and mulch <br />4,840 <br />3 <br />CY <br />Acres <br />$1.25 <br />$800 <br />$G,O50 <br />$2,4UU <br />Disturbance Costs $] 73,892 <br />Contractor Mobilization (8%) $13,91 I <br />(.)verhead (18.5%) $32,170 <br />Administration (5%) $8,694 <br />Total $228.667 <br />f)isturhed acreage - 45 acres <br />l~inartcial Warrantee per Acrc $5,081 <br />Activity Quantity Units Unit Cost Cost <br />Tctnporary Warratttce for Pltase 1 Slurry <br />Wall (to he released uport receipt of att <br />approved Temporary Suhstitute Supply Plan) <br />1. Install slurry wall arouttd P}tase I mining 82,860 square $2.35 $-194;7-2-1- <br />area face <br />(average depth to bedrock 30' - 2,762 foot <br />linear feet of trench, 30' deep=82,869 <br />face feet of slurry wall) <br />Conuactor Mobilization - drree pieces of $10,000 <br />equipment <br />Total -$2.b4~7~1 <br />~.,,~.:i, s~, <br />s~~~ <br />~~ ~ ~o'~ <br />~~ ~ ~$Gy , <br />/iy s-Go <br />X ~~ 3 ~ J,~s <br />~aet9ooo <br />a~9,a) ~. <br />l~,boo <br />yi,GS's ,a.~ <br />i 3,9G / s j <br />~3! ~ t'. 3a <br />3 ~/ Mfr -: 1~ <br />~'~~ 0 o O <br />~57~i; Ov cJ\ <br />J <br /> <br />