Laserfiche WebLink
• <br />n <br />U <br />-3- <br />Note: If the application contains proposed (new) acreage, then a permit <br />revision application form must also be completed for those acreages. <br /> Permitted Actual Proposed <br />8. Mineral ownership: <br />(indicate currently <br />permitted acre for each) <br />Federal: _ ac., n/a n/a <br />State: dC., <br />- n/a n/a <br />Private: _ <br />ac., izo + izo + <br />Indian: aC. n/a n/a <br />9. Surface Ownership: <br />(indicate currently <br />permitted acreage for <br />each) <br />Federal: <br />eC.. n/a n/a <br />_ <br />State: aC., n/a n/a <br />Private: - <br />ac., 120 + 120 + <br />_ <br />Indian: aC. n/a n/a <br />10. Affected area (in acres) 120 + 1zo + <br />11. Disturbed area (in acres) 9.75 9.75 <br />12. Acreage of area rec1 aimed <br />in previous permit term n/a n/a <br />a) backfilled and graded n/a n/a n/a <br />b) retopsolled n/a n/a n/a <br />c) reseeded n/a n/a n/a <br />13. Acreage for which bond <br />has been released <br />a) 60 percent n/a n/a n/a <br />b) 85 percent n/a n/a n/a <br />c) 100 percent n/a n/a n/a <br />14. Renewal Term Requested <br />(Years) n/a n/a 5 <br />15. Type of Mine (check one): x Underground, Surface, <br />Combined Surface and underground, Load-0~ Other- <br />16. Current Permit Status (check one): x Active, Temporary Cessation, <br />_ Permanent cessation (reclamation only), -suspended <br />17. Current Estimated Life of Mine in years: 2 1 <br /> <br />