Laserfiche WebLink
<br />Item No. 12 Access Roads <br /> <br />There are no access roads of the site. All hauling will be done on roads <br />and berms within the proposed pit area. <br />Hauling and movement of traffic will be directly from the pit area to <br />Gold Basin Road, a County maintained paved highway, which is adjacent to <br />the entire East side of the site. <br />Item No, 13 Bond Information <br />It is planned that reclamation will proceed as a continuing operation; as <br />mining is completed in an area the pit will be allowed to fill with water; <br />slopes, berms and adjacent areas will be seeded. <br />The following ratio of degree of disturbance will be maintained: <br />Major disturbance -the area now <br /> <br />being excavated. At no time will <br />excavation be done in a larger area <br />at one time. The calls will be <br />excavated consecutively and <br />adjacent to previously mined areas <br />moving from South to North in the <br />area North of Tomichi Creek. And <br />from North to South in the area <br />South of Tomichi Creek. 7 Acres <br />Page II <br />