Laserfiche WebLink
<br />EXHIBIT D - Mlnint: Plao <br />(a) Mining method will be to strip the topsoil approximately 14' deep and <br />stock pile along edge of pit area <br />(b) The area will be stripped with and loader and stockpiled <br />(c) All overland water flow will be captivated in site. Water will perk <br />down within two days <br />(d) Area to be worked at one time will be approximately 25' deep, 100' <br />wide, 400' long <br />(e) Time table <br />a. Each mining phase is estimated to be approximately 90 days <br />b. Area to be worked at one time will be approximately 25' deep, <br />100' wide, and 400' long. <br />c. Sequence of mining stages will begin at point B and continue <br />towards point A as seen on Exhibit C Mining Plan Map page _ <br />(~ <br />(i) Depth of the deposit to be mined is 25'; type of overburden <br />is rangeland topsoil <br />(ii) Nature of stratum beneath material to be mined is limestone <br />(f) Primary commodity to be mined is Class # 6 road base <br />(g) All intended use of all expected products to be mined by proposed <br />operation: to be used for road maintenance <br />5 <br />