• A digitizer uas used to balance the cut end fill volumes of material needed to create the <br />above-described topography. A swell factor of 15.3 percent was utilized for the adjacent <br />and back 2 spoils based on previous studies. A swell factor of 25 percent was used for <br />the blasted highuall. The two adjacent spoils would be dozed into the open pit and the <br />two back (furthest from the pit) spoils would be graded into the adjacent v's created by <br />the spoil (see appropriate worksheets in Attachment 13-3). <br />Nighwalls will be reduced end sloped towards She open pit. This would be accomplished by <br />drilling and shooting the highuall (see worksheets WC-4 and WA-4) end then dozing/ripping <br />the blasted material into the open pit. See Table 13-2-3, Attachment 13-2 for a complete <br />listing of volumes to be dozed into the open pit. <br />A Caterpillar computer program called EMF was used to determine dozer production. This <br />program utilizes information given in the Caterpillar Handbook. All tables and charts <br />have been computerized to simulate production for [rack type equipment. See various <br />worksheets for production and costs. <br />. The premining end postmining topography maps were compared for material movement. <br />Although a specific postmine topography map is not available for a 1994 mine closure, <br />drainage patterns will generally remain the same as the planned final topography. Due to <br />the fact that the topographic highs and lows will generally be located in [he same area <br />after mining as they were prior to mining, it is not anticipated that wheel type <br />earth movers will be needed to bac kf ill the final pit. <br />Ramp grading estimates are included with spoil grading. It was ass unled that ramps will be <br />graded at the same time as two spoils are pushed into the pit and, therefore, additional <br />cost is not estimated for this project. <br />Topsoil Replacement. Topsoil replacement volumes were based on the volume of material in <br />stockpiles at the end of year 1994. The estimated volume in each stockpile was based on <br />topsoil salvage depth per soil type over a particular area (acres). In an effort to <br />arrive at realistic stockpile volumes, topsoil densities were measured in the field. <br />According to Caterpillar, the swell factor for this type of topsoil would be around 35 <br />percent from BCY to LCY. The material density, as measured in the stockpile, was 2518 <br />• lbs/cy. Assuming this material was compacted to 90 percent of its original density, the <br />original density would have been 2518 lbs/cy divided by .90 = 2800 lbs/BCT. To arrive at <br />the LCY density, take 2800 lbs/BCY divided by 1.35 = 2075 lbs/LCY. Table 13-2-6 is based <br />13-53 Revised 12/01/93 <br /> <br />