Laserfiche WebLink
INTEROFFICE MEMORANDUM <br />TO: UAN IfE <br />FROM: JANE: 1' A <br />SUBJECT: NUI X ?t <br />DATE: 7/5/2007 <br />COST 1?S"1'IMA'C13 <br />,,~;,`~ <br />I have conducted a reclamation cost estimate fox NOI application X-2007-229-00, fox the Cow Camp Underground <br />Project. <br />The applicant proposes to drill 11 holes and construct 11 drill pads. Drill pads will be accessed from existing roads and <br />no new roads are required to be constructed. Each pad may have up to 3 small mud pits during the drilling process. <br />Reclamation of the drill pads will consist of sealing the drill holes with cement and suxgel, mazking each hole, drying and <br />regrading all mudpits, regrading all 11 drill pads, replacing topsoil on the regarded pads, and seeding the pads. The <br />operator may decide to twin up to three of the holes but has not provided reclamation costs for twinned holes in this <br />application. I spoke with Scott Cowman and Rocky Thompson on July 5, 2007, xegazding potentially twinned holes. <br />Should additional holes be necessary to allow for drilling twinned holes, CCR will submit an amendment to this <br />application. Therefore, this application is only considering I1 drill holes. <br />Colorado Coal Resource's (CCR)estimated cost for reclamation of the proposed holes is $42,391.40. The Division's <br />estimated cost for reclamation of these I1 holes and associated pads is 32,224.00. The Division accepts CCR's estimate. <br />Please fmd my supporting CIRCES estimating task sheets attached to this memo. <br />