My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE130837
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE130837
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:31:43 PM
Creation date
11/25/2007 10:41:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200722900
IBM Index Class Name
Permit File
Doc Date
7/6/2007
Doc Name
Adequacy Letter
From
DRMS
To
Colorado Coal Resources, LLC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Agency or organization name :Colorado Division Of Reclamation Mining And Safety <br />Task # : 29F State :Colorado Pertnitfjob # :X2007-229-00 <br />Date : 07Po52007 County :Moffat Abbreviation :none <br />User : JHB Site :Cow Camp Underground Filename :X-00-29F <br />Permit or other job action :Cow Camp Project <br />task description :Mobilize/demobilize equipment from <br />EQUIPMENT TRANSPORT RIG COST Shin basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powe2d, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic /olding gooseneck, drop deck equipment trailer (25T, SOT, and 100T) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br /> Operating cost/hour : $44.38 $46.13 $50.07 <br /> OperatorcosUhour: $27.68 $27.66 $27.66 <br /> Helpercost/hour: $0.00 $25.39 $25.39 <br /> Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />Machine <br />Description WeighUunit <br />(tons) Ownership <br />CosUhr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />CosUhr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />CosUfleet <br />-Air compressor, diesel -13 1.15 $1.50 $88.67 1 $90.17 $88.67 $0.00 <br />-Cat D6R LGP - 6S (2003) 28.39 $28.55 $117.55 1 $146.10 $117.55 $0.00 <br />-Seeding equipment 20.00 $35.00 $88.67 1 $123.67 $88.67 $0.00 <br />sheet 1 of 2 <br />Subtotals :~ $359.94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.