My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE130750
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE130750
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:31:39 PM
Creation date
11/25/2007 10:38:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
Permit File
Doc Date
7/19/1996
Doc Name
MEMO SUNNYSIDE MINE PN M-77-378 REVIEW OF OPERATORS COST ESTIMATE FOR BULKHEAD SEAL REPLACEMENT
From
JAMES DILLIE
To
BRUCE HUMPHRIES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•Y <br />INTEROFFICE MEMORANDUM <br />DIVISION OF ~rnvFnzr•c AHI! CSOLO/GY <br />TO: BRUCE HUMPHRIES, JIM STEVENS, <br />TOM GILLIS, ALLEN SORENSON <br />FROM: James Dillie <br />DATE: July 19, 1996 ~~~ <br />!IIlIIIIIIIIlIIIIII <br />~v <br />RE: SUNNYSIDE MINE -Permit No~~IVI-77-378 eview of <br />Operator's Cost Estimate for Bul ea a Replacement <br />I have completed a review of the operator's cost estimate for replacing the bulkhead seals <br />in the American and Terry Tunnels; I have also reviewed Tom Gillis' mem\~ regarding <br />his review. <br />Except for the replacement of the upper seals, I fully agree with Tom's analysis and <br />recommendations. Replacement of the bulkhead seals, at some future date, will require <br />a specialty contractor who will probably mobilize from some considerable distance, need <br />to recruit workers with underground mining experience and pay their living expenses <br />during the project. A substantial contingency cost will probably be included in the bid, <br />due to the many unknown variables. <br />I recommend that the operator re-calculate the bond requirement to include the costs <br />related to the items outlined in Tom Gillis' July 11, 1996 memo (excluding replacement <br />of the upper bulkhead seats). <br />M:\osa\gaw\Suonyside.jd <br />
The URL can be used to link to this page
Your browser does not support the video tag.