Laserfiche WebLink
Colorado Division of Minerals and Geology <br />ESTIMATING FORM - SCRAPER WORK <br />TASK N0. 4 PREP. BY: SHE PERMIT N0. M-97-089 <br />___-_____- ________ __-_______ <br />DATE 12/08/97 FILENAME: M089-4 MINE: Stone Gravel Pit <br />PERMIT POTION 112c application estimation <br />TASK DESCRIPTION Topsoil replace over Phase Ifl area <br />HOURLY EQUIPMENT COSTS: <br />County: MON TEZUMA <br />Scraper team make-up <br />Single, Double or Triple <br />labor Zone : 1 Shifts 5 <br />Equi Anent Descriptions <br />CAT 623E with ROPS cab <br />Road main[. - Grader N/A <br />- Water T.: N/A <br />Scraper Team <br />Scraper Dozers) <br />Equipment FiLename:623E-ROP <br />Utilization on job: 100X N/A <br />-------- -------- <br />Cost Breakdown: <br />Ownership cost/hr: 538.24 N/A <br />Operating cost/hr: 578.97 N/A <br />Operator cost/hr: 523.13 N/A <br />Unit subtotals: 514D.34 N/A <br />________ ________ <br />Scraper team subtotal 5140.34 <br />Total Work Team Cost/Hr: 8140.34 <br />MATERIAL DUANT IT IES: <br />Road Maintenance <br />Grader Water truck <br />N/A N/A <br />_______ _________ <br />N/A N/A <br />N/A N/A <br />N/A N/A <br />N/A N/A <br />N/A N/A <br />Main[. subtotal N/A <br />Beg. <br />Volume: 9794.7 LCY <br />Cu.Yd. ---------- Swell Loose <br />Volume: 9,795 LCY Factor: N/A Volume: 9,795 LCY <br />Source of quantity take-off: Phase I11, Process/Stockpile 8 Phase IV Areas <br />Source of est. swell factor: NA <br />