Laserfiche WebLink
<br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />7373 Sherman Street, Room 878 <br />Denver, Colorado 80203 <br />Phone (303) 866-3581 <br />FAX (303) 866-3589 <br />www.watecstate.co.us <br />Response to Reclamation Permit Application Consideration <br />DATE: January 29, 2003 r <br />TO: Harry H. Posey, Senior Environmental Protection Specialist <br />CC: Division 2 Office; Dis ict 13 Water Commissioner <br />FROM: Don West, P.E. ~ ~...- \ <br />RE: Boyer Pit, File No. M-2 00 2-122 ~J~ O ~~rnt'~-STS <br />Operator: Seifert instruction, <br />Contact: Jerald A. Seifert 719/783-2757 <br />Section 5, Twp 24 S. , Rng 71 W. , 6th P.M., Custer County <br />CONDITIONS FOR APPROVAL <br />Op.co~~ <br />y'//\ ~ ~I <br />I <br />+~.; <br />« ~ <br />Y 18~6~ <br />Bill Owens <br />Governor <br />Greg E. Walther <br />Executive Direttor <br />Hal D. Simpson, P.E. <br />State Engineer <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />® The proposed operation will consume ground water by: ^ evaporation, ^ dust control, ^ <br />reclamation, ^ water removed in the mined product, ®processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />® Other: Applicant states that stormwater will be contained on-site. All ponded stormwater must be <br />released to the natural stream system within 72 hours, or all work must cease until a substitute water <br />supply plan, or augmentation plan approved by water court, is obtained. <br />COMMENTS: <br />