Laserfiche WebLink
~• STATE OF C~L~O~~ADO <br />~~ <br />OFFICE OF THE STATE ENGINEER <br />Division of V/ater Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 1// <br />Denver, Colorado eozo3 Response to Reclamation Permit Application Consideration <br />Phone 1303) 866-3581 r--`_ <br />FAX 1303) 868.3589 RECEIVED <br />www.watecstate.m.us <br />DATE: November 3, 2006 1~1~ Q ~~ 7~O6 <br />Division of Reclamation, <br />TO: Richard M. Wenzel, Environmental Protection Specialist Mining and Safety <br />OF C~ <br />,~e_~ <br />N<///~~~~yyyyy~~~~~~yp 222~~~ <br />ff <br />~ te76 ~ <br />Bill pwens <br />Governor <br />2ussell George <br />Executive Director <br />Hal D. Simpson, P.E. <br />Stale Engineer <br />CC: Division 5 Office; District 51 Water Commissioner <br />FROM: Cynthia J. Love, Water Resource Engineer ~~ <br />RE: Operator: Granby Realty Holdings LLC, Overlook Mine, File No. M-200 -075 <br />Section 9, Twp 1 N, Rng 76 W, 6th P.M., Grand County <br />Landowner- Granbv Realrv Holdings LLC <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground water must not <br />occur during or after mining operations. <br />^ The proposed operation will consume ground water by ^evaporation, ^dust control, ^reclamation, ^water <br />removed in the mined product, ^processing, ^other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or other type <br />of well permit, as applicable. Prior to obtaining a permit, an approved water supply plan or decreed plan for <br />augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and document the <br />locations of all wells within 600 feet mile of the permit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 Feet of the permit area or contact this office regarding the <br />600 foot spacing notification/hearing process. <br />^ The proposed operation may have potential impact on existing water rights near the project location. Please <br />provide evidence that the proposed project will not alter or impact the historic operation of existing water rights. <br />® The applicant has indicated plans to use other water (trucked in from off-site) for: dust control uses at [he <br />permit site, storage in the excavated area(s). The applicant will need to provide evidence to this office that <br />the water is permitted or decreed for such uses. <br />^ Other: <br />COMMENTS: <br />