Laserfiche WebLink
<br />PROJECT IDENTIFICATION <br />Task # : Oj~1'''7j <br />Date : 04/06/2001 <br />User : GRS <br />Agency or organization name : DMG <br /> <br />PermiVjob# :M2001-018 <br />Abbreviation :none <br />Filename : M018-001 <br />Permit or other job action :New App. <br />Task description :Reduce highwa/l <br />- - - <br />HOURLY EQUIPMENT COST - -- <br /> Basic machine : Cat D7R - 7U <br /> Blade type :Universal <br /> Attachmentno.l :ROPS Cab <br /> Attachmentno.2 :NA <br />Horsepower: 230 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $37.61 NA <br />Operating cosUhour : $49.66 100 <br />Ripper op. cosUhour : $0.00 NA <br />Operator cosUhour : $27.99 NA <br />Total unit cosVhour <br />~- - - - - ~ : $115.26 Total fleet cosUhour : $115.26 <br />I <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 304 LCY factor : NA volume : 304 LCY <br />Source of estimated volume :NA <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance : 60 feet <br />Unadjusted hourly production : 940.0 LCYlhr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Gravel - Pitmn <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State :Colorado <br />County :Logan <br />Site : Schumaker li <br />10.00 % (neg) <br />3.250 Ibs/LCY <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.284 /LCY <br />Job Condition Correction Factors <br />Operator skill : <br />0.75 Source <br />(avg.) <br />Material consistency : 1.00 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (lshift/day) <br />Spoil pile : 0.80 (fnd-rn <br />Push gradient : 1.22 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.71 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.43 <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost <br />405.82 LCY/hr <br />405.82 LCY/hr <br />0.75 Hours <br />$86 <br />