Laserfiche WebLink
ALL TREES ALONG SH85 SHALL BE PLANTED ON <br />h I SW TKO JOINT VENTURE PROPERTY SO THAT <br />1_I THE DRIPLINE OF THE TREES DOES EXTEND INTO <br />NTHE CDOT RIGHT -OF -WAY AT MATURITY. <br />I i <br />.Iz 50 <br />SETBACK - - <br />IfT - <br />�� .]C 1 KVV I LX[LL VT /'ILL 1 KCC.J 4 <br />EXISTIK16 TREE <br />F V.:/vV'.VG <br />ABOVE GRADE IM 112RI6ATED AREAS AND <br />1111111111 111111 m � <br />CENTRAL. LEADER. <br />AT GRADE TO 2' ABOVE GRADE IN <br />.t�� :.1�R1��YiiiE ...•.... <br />•• • .� .- <br />NON - IRRIGATED AREAS. MODIFY IF 501L <br />1111 <br />WRAP TRUNK FROM 6QOLW <br />CONDITIONS WARRANT E PER CITY <br />EXI5TIN6 POWER POLE <br />LEVEL TO SECOND BRAKKH <br />DIRECTION. INSTALL A 5' H16H BEAM <br />Q §-CW <br />WITH 4' KRAFT TYPE TREE <br />AROUND TREES TO CREATE A WATERING <br />�� <br />WRAP. 5ECURE END5 WITH <br />BA51N. BERM 15 TEMPORARY IN IT2R16ATETD <br />KF <br />FLEXIBLE TAPE. <br />AREAS. REMOVE BERM AFTER TWO <br />` ® <br />i � r • <br />THOROUGH WATERIN65 IN IRRI6ATED <br />- , <br />STAN GU <br />DARD YING SYSTEM: (OALY <br />AREAS £ MULCH. LEAVE BERM E MLLL44 IN <br />WHERE NECESSARY) MIN.V LOK16 <br />NON - IRRIGATED AREAS E IN AREAS ONLY <br />011i <br />HEAVY DUTY T -BAR STEEL POST <br />IRRIGATED BY DRIP SYSTEMS AFTER <br />STAKES WITH WHITE T-PO5T 6AIP5 <br />AkV WITH 17 GAUGE 6.4LVRNIZED <br />DRYLAND GRASS ESTABLISHMENT PERIOD. <br />+� I y, <br />u � <br />STEEL WIRE 6UY5 SECURED TO 71 <br />4' DEEP WOOD CHIP MULCH <br />WITH CANVAS STRAP A50VE FIRST <br />FLUSH WITH SOD AT EDGE.E TO <br />• • •.. <br />BRANCH. WIRE TO BE TAUT BUT MIOT <br />BE KEPT 7 FROM TRUIJC. <br />-�� LYYIi <br />:. • . <br />OVER- T16HT. FLAG WIQE WITH VVHITE <br />m� <br />PLA5TI6 FLA661N6 TAPE.C.MIFEIR5 TO <br />HAVE 2 STAKES FOR TREES V AMID <br />ALTERNATE CONIFER 6UY1N6 SYSTEM: <br />-. <br />LESS, 3 STAKES FOR TREES ABOVE 6'. <br />EQUALLY SPA6ED 30' STEEL STAKES <br />DECIDUOUS TREES TO HAVE 2 STAKES <br />WIT14 WHITE TOPS, SET FLUSH WIT14 <br />FOR TREES 2 -112' CAL. AND LESS, 3 <br />GRADE. GUY TO MID -POINT OF TREE <br />- - <br />STAKES ABOVE 2-117 CAL. ONE STAKE <br />E FLAG WIRE WITH I/7 DIAMETER rF.+,. <br />_- 3r <br />ALWAYS IN DIRECTION OF PREVAIILIN6 <br />WHITE PV6 PIPE. Ili -1 <br />Illl <br />_ <br />II' II <br />III -.: WIkV5. REMOVE STAKES E 6UY5 <br />= <br />II <br />IE GROWI <br />AFTER OI.NG SEASON. <br />REMOVE BOTTOM I/3 OF WIRE BASKET. <br />:.. <br />IIIIII_I <br />Mew <br />SET TREE IN PIT TO PROPER GRADE ACID III <br />111 II <br />II _ PREPARED 5ACKFILL MIXTURE <br />PLUMB. REMOVE QEMAININ6 WIRE E ' <br />ii= il -nl I Ir - -IIi III nl II I I I I <br />� , I. ONE PART COMPOST OR APPRIOVED EQUAL. <br />TWINE. IF PLASTIC OR TREATED BURLAP, <br />REMOVE AS MUCH AS POSSIBLE E <br />2. TWO PARTS TOPSOIL. <br />BACKFILL. IF RE6Ul.Al2 BURLAP, 15ACKFILL <br />DIAMETER 2x'5 <br />3. THREE PARTS NATIVE SOIL. <br />2/3 OF PIT, REMOVE TOP 1/3 OF BURLAP E - <br />BALL WIDTH <br />4. MATERIALS TO BE THOROUGHLY BLENDED. <br />COMPLETE BACKFILL. <br />UNDISTURBED SOIL <br />TREE PLANTING DETAIL <br />K10T TO SCALE <br />MINING LANDSCAPE NOTES: <br />I. ALL PROPOSED LANDSCAPING SHALL 5E IRRIGATED WITH AN IRRIGATION SYSTEM. AREAS PLANTED <br />WITH THE SPECIFIED SEED MIX SHALL BE IRRIGATED UNTIL E5TA5LIS4ED. <br />2. ALL TREES SHALL HAVE 3' DIAMETER TREE WELLS. 54412LI55 AND TREES TO 5E MULCHED WITH <br />WOOD MULG4 IN 4' MINIMUM DEEP BEDS TO FACILITATE MOWIN6 UNTIL TREES AND SHRUBS ARE <br />WELL ESTABLISHED. <br />3. LOCATION OF LANDSCAPE MATERIAL WILL BE SUBJECT TO FIELD ADJI5TMEIJT TO ACCOMMODATE <br />ANY FIXED IMPROVEMENTS AND SITE CONDITION5. <br />4. ALL LAN05CAPIN6 SHALL MEET THE UTILITY CLEARANCE RE:QUIREMENT5. TREE5 CANNOT 5E <br />PLANTED WITHIN 5' OF A UTILITY LINE. <br />5. THE LAKVSC.APE CONTRA6TO2 SHALL CALL FOR ALL UTILITY LOCATE5 AND FIELD VERIFY THE <br />LOCATION OF ALL UNDER62OUAID UTILITIES. <br />6. ALL LANDSCAPE SHALL BE INSTALLED COMS15TFMF WITH XERISCAPE STANDARDS FOR <br />INSTALLATION• SOIL PREPARATION AND IRRIGATION. <br />7. ALL 51 LANDSCAPE AREAS SHALL BE RESEEDED AS NEEDED UNTIL WELL ESTABLISHED. <br />S. T2EE5 AND SHRUBS PLANTED WITHIN MULC4E0 BEDS WITHOUT E061N6 SHALL BE DRIP IRRIGATED. <br />MULCHED BED5 SHALL NOT 1.5E MAINTAINED ONCE TREES AND SHRUBS HAVE BEEN E5TA5LISHED OR <br />BEYOND 5 YEARS. NATIVE GRASSES ARE TO FILL IN AROUND THEM AND REPLACE THE MULCHED <br />BEDS AFTER E5TABLI5HMEKT. <br />9. ALL TREES AND 5141255 SHALL BE PLANTED AT A MINIMUM OF 20' FROM THE MINING HIGH WALL. <br />10. TREES AND SHRUBS SPECIES SHALL_ 5E PLANTED AT THE RELATIVE PROPORTIONS LISTED ON THE <br />PLANT 50- FEDULE. TREES AND SHRUBS SHALL BE CLUSTERED AS SHOWN ON THE PLAN. COUNTS <br />ARE PROVIDED FOR CALCULATION PURPOSES ONLY. IN THE CASE OF DISCREPANCIES NUMBERS <br />SHOWN ON THE PLAN SHALL OVERRIDE THE IJJMBERS PROVIDED ON THE PLANT SC.I41EDULE. <br />11. ALL 5U5TITUTION5 SHALL BE APPROVED BY LANDSCAPE ARCHITECT PRIOR TO PLANTIN6.PROPOSED <br />SUBSTITUTIONS MUST BE NATIVE AND WILL ONLY BE ACCEPTED 5A5ED ON AVAILABILTY AND SITE CONDITIONS. <br />12. TEMPORARY STOCKPILES THAT ARE NOT DISTURBED REGULARLY WILL BE SEEDED WIT14LUKLA <br />PUBESCENT W4EAT62A55 AND /OR AMUR IMMEDIATE WHEAT6RA55 AT A RATE OF 15LI55 PL5 /ACRE, <br />WITHIN 45 DAYS, WEATHER PERMITTING. <br />13. 5EEDIW65 OF SPECIFIED NATIVE GRASS MIX WILL TAKE PLACE ONCE FINAL 6RADIN6 AND <br />REPLACEMENT OF TOPSOIL HAVE BEEN COMPLETED FOR EACH PHASE. <br />14. FORDS SPECIES LISTED IN THE SEED 564-+EDULE SHALL BE ADDED TO THE SEED MIX WIEAI <br />SEEDING 5ERM5 AND AREAS AV_IACEKT TO THE TRAILS AND ADJACENT HOMES. <br />15. SEEDING RATE5 SHALL BE DOUBLED WHEN SEED MIX IS HAND - BROADCAST. <br />16. SEEDING SHALL TAKE PLACE BETWEEN LATE 5EPTEM5ER AND MID -APRIL TO ASSURE ADEQUATE <br />51TE CONDITIONS FOR GEQMINATIOM. SEEDING SHAI_.I_. BE DONE IN UJ- FROZEN SOIL. <br />17. QEVEGETATED AREAS WILL BE MULCHED WITH CLEAN, WEED -FREE STRAW OR NATIVE HAY. HAY <br />SHALL BE APPLIED AT A RATE OF 4.000 L55 /ACQE AND CRIMPED INTO T14E SOIL. CRIMPING WILL <br />BE DOME ALOK16 THE CONTOUR. <br />PRUNE DEAD OR DAMAGED <br />BRAKIGRE5 PRIOR TO PL.AKTING. <br />IF FORM 15 COMPROMISED BY <br />PRUNING, REPLACE SHRUB. <br />SPACE PLAKTS AND SET PLUMB <br />FOR 5E5T EFFECT. <br />MOUND COMPACTED BACKFILL <br />ENDER ROOT5ALL OR <br />SET ON UNDISTURBFJD SOIL. <br />REMOVE ALL COKTAINE125, 5A5KE <br />WIRE ET6. FROM 2OOT5ALL <br />SET SHRUB PLUMB. <br />TOP OF ROOT BALL TO <br />MATCH FIMI514 GRADE <br />50 DEEP SHREADED CEDAR MULC44 <br />INSIDE SAUCER FOR ALL 51 <br />PREPARED BAC.KFILL MIXTURE <br />I. ONE PART COMPOST <br />OR APPROVED EQUAL. <br />Q. TWO PARTS TOPSOIL. <br />3. THREE PARTS NATIVE SOIL. <br />4. MATERIALS TO 5E THOROUGHLY <br />DIAMETER BLENDED. <br />2-3 X5 BALL WIDTH <br />SHIM PLANTING DETAIL <br />NOT TO SCALE <br />5 MIN <br />II <br />ZENI <br />SEED WITH SPECIFIED <br />NATIVE GRASS MIX AND E <br />WATER TO ESTABLISH <br />TYPICAL - TEMPORARY MINING BERM GROSS SECTION <br />NOT TO SCALE <br />1:1 (TYP.) <br />{gzx >^ <br />s � <br />EXISTIK16 TREE <br />1 <br />EXISTING 5TRUGTLIRES <br />1111111111 111111 m � <br />• • r : I <br />z z z z <br />.t�� :.1�R1��YiiiE ...•.... <br />•• • .� .- <br />.� .. . <br />1111 <br />i i <br />jlf <br />EXI5TIN6 POWER POLE <br />E <br />EX15TIK16 OVERHEAD <br />Q §-CW <br />POWER <br />6 <br />EXISTING 6A5 LINE <br />DMG ADEQUACY RESPONSE <br />6A5 MARKER <br />KF <br />PETROLEUM WELL <br />U <br />i. :r . • •• <br />i � r • <br />..nrn re <br />�m <br />4/15/05 <br />I: <br />• • •.. <br />. • .. <br />0� <br />:. • . <br />• . _ .. <br />m� <br />:.. ".119. <br />:.. <br />• . . • . . •. - <br />Mew <br />wom <br />1:1 (TYP.) <br />{gzx >^ <br />s � <br />NOTE: <br />CIVIL RESOURCES, LL6. 15 NOT 2E5POIJ516LE FOR 5AFETY, IM, OM, OR ABOUT <br />THE PROJECT 51TE, NOR FOR COMPLIANCE 5Y T14E APPROPRIATE PARTY OF <br />AMY REGULATIONS THERETO. <br />THESE MAP5 WERE PREPARED BY CIVIL RESOURCES, LL6. IN COOPERATION <br />WITH 5W TKO JOINT VENTURE, LL6. 5W TKO JOINT VENTURE, LLG. WILL KEEP <br />THE DIVISION OF MINERALS AND 6EOL06Y INFORMED OFAKIY GNAN6E5 TO THE <br />MIMING OR RE61AMATIOM PLAN5 THROl!66l4 ANNUAL REPORTS AND FILE <br />TECHNICAL REV151OM5 Al AMENDMENT APPLICATIONS A5 NECESSARY <br />THROL16ROWIF THEM THE MIME. <br />r <br />�. c <br />tDANMA ORTIZ DATE <br />CIVIL RE50URCE5, LL6. <br />i <br />50' <br />SETB <br />11� <br />EXISTIK16 TREE <br />1 <br />EXISTING 5TRUGTLIRES <br />1111111111 111111 m � <br />PERMIT BOUNDARY <br />z z z z <br />.t�� :.1�R1��YiiiE ...•.... <br />-X- <br />EXI5TIM6 WATER <br />- - - - <br />EXI5TIN6 I' C.MTOUR5 <br />jlf <br />EXI5TIN6 POWER POLE <br />E <br />EX15TIK16 OVERHEAD <br />Q §-CW <br />POWER <br />6 <br />EXISTING 6A5 LINE <br />DMG ADEQUACY RESPONSE <br />6A5 MARKER <br />KF <br />PETROLEUM WELL <br />U <br />i. :r . • •• <br />i � r • <br />..nrn re <br />�m <br />4/15/05 <br />I: <br />NOTE: <br />CIVIL RESOURCES, LL6. 15 NOT 2E5POIJ516LE FOR 5AFETY, IM, OM, OR ABOUT <br />THE PROJECT 51TE, NOR FOR COMPLIANCE 5Y T14E APPROPRIATE PARTY OF <br />AMY REGULATIONS THERETO. <br />THESE MAP5 WERE PREPARED BY CIVIL RESOURCES, LL6. IN COOPERATION <br />WITH 5W TKO JOINT VENTURE, LL6. 5W TKO JOINT VENTURE, LLG. WILL KEEP <br />THE DIVISION OF MINERALS AND 6EOL06Y INFORMED OFAKIY GNAN6E5 TO THE <br />MIMING OR RE61AMATIOM PLAN5 THROl!66l4 ANNUAL REPORTS AND FILE <br />TECHNICAL REV151OM5 Al AMENDMENT APPLICATIONS A5 NECESSARY <br />THROL16ROWIF THEM THE MIME. <br />r <br />�. c <br />tDANMA ORTIZ DATE <br />CIVIL RE50URCE5, LL6. <br />i <br />50' <br />SETB <br />11� <br />EXISTIK16 TREE <br />1 <br />EXISTING 5TRUGTLIRES <br />1111111111 111111 m � <br />PERMIT BOUNDARY <br />z z z z <br />.t�� :.1�R1��YiiiE ...•.... <br />-X- <br />EXI5TIM6 WATER <br />- - - - <br />EXI5TIN6 I' C.MTOUR5 <br />jlf <br />EXI5TIN6 POWER POLE <br />E <br />EX15TIK16 OVERHEAD <br />Q §-CW <br />r - - __7c7- - -� <br />' SETBACK <br />J I <br />LEGEND: <br />EXISTIK16 TREE <br />NO. <br />EXISTING 5TRUGTLIRES <br />1111111111 111111 m � <br />PERMIT BOUNDARY <br />z z z z <br />100 YR. FLOODPLAIM <br />-X- <br />EXI5TIM6 WATER <br />- - - - <br />EXI5TIN6 I' C.MTOUR5 <br />jlf <br />EXI5TIN6 POWER POLE <br />E <br />EX15TIK16 OVERHEAD <br />Q §-CW <br />POWER <br />6 <br />EXISTING 6A5 LINE <br />DMG ADEQUACY RESPONSE <br />6A5 MARKER <br />KF <br />PETROLEUM WELL <br />U <br />GAS /OIL EQUIPMEMT <br />11 (TYP.) <br />25' <br />SETBACK I <br />� ? <br />EXISTIK16 TREE <br />NO. <br />EXISTING 5TRUGTLIRES <br />DATE <br />14I6H WATER LINE OF <br />1 <br />RECLAIMED POMD5 <br />-X- <br />FENCE <br />fill <br />TELEPHONE PEDESTAL <br />ou a . awy <br />EVERGREEN TREE5 <br />451 Oak Street, Suite 209 <br />CIVIL R E SOURCES, L L C P.O. Box 680 Frederick, CO 80530 <br />303 833 1416 (p) 303 833 2850 (f) <br />DESIGNED BY: OF JOB NO. DWG: <br />DRAWN BY: ARR /SR DATE: SEPT. 2004 DMG- Revised for Adequacy Response 4 -1 -05 <br />- SCALE: AS NOTED SHEET: <br />CHECKED BY: DO 50, <br />DECIDUOUS TREE5 <br />Q §-CW <br />LARGE 51412-1,155 <br />o <br />SMALL SHRUBS <br />I <br />l= <br />r <br />IM111111111 <br />North <br />0 50 100' 200' <br />SCALE: I"=100' <br />Permit #: ') > Confdental?: Q; <br />Class: ,til } MV# <br />From: <br />Doc. Name: 1be,> , e( 4 <br />Doc. Date (if no date'stamp): q-15 M- Section /Exh <br />Inspection Date Specialist: <br />LUP70N LAKES RESOURCE, <br />PT. LUP70N SPECIAL USE PERMIT AND <br />MLRB 112 RECLAMATION PERMIT M- 2004 -078 <br />MINING LANZ)51SA E FLAN <br />SW TKO JOINT VENTURE, LLG <br />NO. <br />REVISIONS <br />DESCRIPTION <br />DATE <br />BY <br />1 <br />REVISIONS PER SW TKO <br />1119104 <br />DF <br />2 <br />NAME CHANGE PER DMG <br />12/20/04 <br />OF <br />451 Oak Street, Suite 209 <br />CIVIL R E SOURCES, L L C P.O. Box 680 Frederick, CO 80530 <br />303 833 1416 (p) 303 833 2850 (f) <br />DESIGNED BY: OF JOB NO. DWG: <br />DRAWN BY: ARR /SR DATE: SEPT. 2004 DMG- Revised for Adequacy Response 4 -1 -05 <br />- SCALE: AS NOTED SHEET: <br />CHECKED BY: DO 50, <br />3 <br />4 <br />PERMIT NO. CHANGE PER DMG <br />FT LUPTON SPECIAL USE <br />1/27/05 <br />3/24/05 <br />DF <br />SR <br />5 <br />DMG ADEQUACY RESPONSE <br />3/28/05 <br />KF <br />6 <br />NAME CORRECTION <br />4/8/05 <br />KF <br />7 <br />ADE UACY REST NSE <br />4/15/05 <br />KF <br />Permit #: ') > Confdental?: Q; <br />Class: ,til } MV# <br />From: <br />Doc. Name: 1be,> , e( 4 <br />Doc. Date (if no date'stamp): q-15 M- Section /Exh <br />Inspection Date Specialist: <br />