ALL TREES ALONG SH85 SHALL BE PLANTED ON
<br />h I SW TKO JOINT VENTURE PROPERTY SO THAT
<br />1_I THE DRIPLINE OF THE TREES DOES EXTEND INTO
<br />NTHE CDOT RIGHT -OF -WAY AT MATURITY.
<br />I i
<br />.Iz 50
<br />SETBACK - -
<br />IfT -
<br />�� .]C 1 KVV I LX[LL VT /'ILL 1 KCC.J 4
<br />EXISTIK16 TREE
<br />F V.:/vV'.VG
<br />ABOVE GRADE IM 112RI6ATED AREAS AND
<br />1111111111 111111 m �
<br />CENTRAL. LEADER.
<br />AT GRADE TO 2' ABOVE GRADE IN
<br />.t�� :.1�R1��YiiiE ...•....
<br />•• • .� .-
<br />NON - IRRIGATED AREAS. MODIFY IF 501L
<br />1111
<br />WRAP TRUNK FROM 6QOLW
<br />CONDITIONS WARRANT E PER CITY
<br />EXI5TIN6 POWER POLE
<br />LEVEL TO SECOND BRAKKH
<br />DIRECTION. INSTALL A 5' H16H BEAM
<br />Q §-CW
<br />WITH 4' KRAFT TYPE TREE
<br />AROUND TREES TO CREATE A WATERING
<br />��
<br />WRAP. 5ECURE END5 WITH
<br />BA51N. BERM 15 TEMPORARY IN IT2R16ATETD
<br />KF
<br />FLEXIBLE TAPE.
<br />AREAS. REMOVE BERM AFTER TWO
<br />` ®
<br />i � r •
<br />THOROUGH WATERIN65 IN IRRI6ATED
<br />- ,
<br />STAN GU
<br />DARD YING SYSTEM: (OALY
<br />AREAS £ MULCH. LEAVE BERM E MLLL44 IN
<br />WHERE NECESSARY) MIN.V LOK16
<br />NON - IRRIGATED AREAS E IN AREAS ONLY
<br />011i
<br />HEAVY DUTY T -BAR STEEL POST
<br />IRRIGATED BY DRIP SYSTEMS AFTER
<br />STAKES WITH WHITE T-PO5T 6AIP5
<br />AkV WITH 17 GAUGE 6.4LVRNIZED
<br />DRYLAND GRASS ESTABLISHMENT PERIOD.
<br />+� I y,
<br />u �
<br />STEEL WIRE 6UY5 SECURED TO 71
<br />4' DEEP WOOD CHIP MULCH
<br />WITH CANVAS STRAP A50VE FIRST
<br />FLUSH WITH SOD AT EDGE.E TO
<br />• • •..
<br />BRANCH. WIRE TO BE TAUT BUT MIOT
<br />BE KEPT 7 FROM TRUIJC.
<br />-�� LYYIi
<br />:. • .
<br />OVER- T16HT. FLAG WIQE WITH VVHITE
<br />m�
<br />PLA5TI6 FLA661N6 TAPE.C.MIFEIR5 TO
<br />HAVE 2 STAKES FOR TREES V AMID
<br />ALTERNATE CONIFER 6UY1N6 SYSTEM:
<br />-.
<br />LESS, 3 STAKES FOR TREES ABOVE 6'.
<br />EQUALLY SPA6ED 30' STEEL STAKES
<br />DECIDUOUS TREES TO HAVE 2 STAKES
<br />WIT14 WHITE TOPS, SET FLUSH WIT14
<br />FOR TREES 2 -112' CAL. AND LESS, 3
<br />GRADE. GUY TO MID -POINT OF TREE
<br />- -
<br />STAKES ABOVE 2-117 CAL. ONE STAKE
<br />E FLAG WIRE WITH I/7 DIAMETER rF.+,.
<br />_- 3r
<br />ALWAYS IN DIRECTION OF PREVAIILIN6
<br />WHITE PV6 PIPE. Ili -1
<br />Illl
<br />_
<br />II' II
<br />III -.: WIkV5. REMOVE STAKES E 6UY5
<br />=
<br />II
<br />IE GROWI
<br />AFTER OI.NG SEASON.
<br />REMOVE BOTTOM I/3 OF WIRE BASKET.
<br />:..
<br />IIIIII_I
<br />Mew
<br />SET TREE IN PIT TO PROPER GRADE ACID III
<br />111 II
<br />II _ PREPARED 5ACKFILL MIXTURE
<br />PLUMB. REMOVE QEMAININ6 WIRE E '
<br />ii= il -nl I Ir - -IIi III nl II I I I I
<br />� , I. ONE PART COMPOST OR APPRIOVED EQUAL.
<br />TWINE. IF PLASTIC OR TREATED BURLAP,
<br />REMOVE AS MUCH AS POSSIBLE E
<br />2. TWO PARTS TOPSOIL.
<br />BACKFILL. IF RE6Ul.Al2 BURLAP, 15ACKFILL
<br />DIAMETER 2x'5
<br />3. THREE PARTS NATIVE SOIL.
<br />2/3 OF PIT, REMOVE TOP 1/3 OF BURLAP E -
<br />BALL WIDTH
<br />4. MATERIALS TO BE THOROUGHLY BLENDED.
<br />COMPLETE BACKFILL.
<br />UNDISTURBED SOIL
<br />TREE PLANTING DETAIL
<br />K10T TO SCALE
<br />MINING LANDSCAPE NOTES:
<br />I. ALL PROPOSED LANDSCAPING SHALL 5E IRRIGATED WITH AN IRRIGATION SYSTEM. AREAS PLANTED
<br />WITH THE SPECIFIED SEED MIX SHALL BE IRRIGATED UNTIL E5TA5LIS4ED.
<br />2. ALL TREES SHALL HAVE 3' DIAMETER TREE WELLS. 54412LI55 AND TREES TO 5E MULCHED WITH
<br />WOOD MULG4 IN 4' MINIMUM DEEP BEDS TO FACILITATE MOWIN6 UNTIL TREES AND SHRUBS ARE
<br />WELL ESTABLISHED.
<br />3. LOCATION OF LANDSCAPE MATERIAL WILL BE SUBJECT TO FIELD ADJI5TMEIJT TO ACCOMMODATE
<br />ANY FIXED IMPROVEMENTS AND SITE CONDITION5.
<br />4. ALL LAN05CAPIN6 SHALL MEET THE UTILITY CLEARANCE RE:QUIREMENT5. TREE5 CANNOT 5E
<br />PLANTED WITHIN 5' OF A UTILITY LINE.
<br />5. THE LAKVSC.APE CONTRA6TO2 SHALL CALL FOR ALL UTILITY LOCATE5 AND FIELD VERIFY THE
<br />LOCATION OF ALL UNDER62OUAID UTILITIES.
<br />6. ALL LANDSCAPE SHALL BE INSTALLED COMS15TFMF WITH XERISCAPE STANDARDS FOR
<br />INSTALLATION• SOIL PREPARATION AND IRRIGATION.
<br />7. ALL 51 LANDSCAPE AREAS SHALL BE RESEEDED AS NEEDED UNTIL WELL ESTABLISHED.
<br />S. T2EE5 AND SHRUBS PLANTED WITHIN MULC4E0 BEDS WITHOUT E061N6 SHALL BE DRIP IRRIGATED.
<br />MULCHED BED5 SHALL NOT 1.5E MAINTAINED ONCE TREES AND SHRUBS HAVE BEEN E5TA5LISHED OR
<br />BEYOND 5 YEARS. NATIVE GRASSES ARE TO FILL IN AROUND THEM AND REPLACE THE MULCHED
<br />BEDS AFTER E5TABLI5HMEKT.
<br />9. ALL TREES AND 5141255 SHALL BE PLANTED AT A MINIMUM OF 20' FROM THE MINING HIGH WALL.
<br />10. TREES AND SHRUBS SPECIES SHALL_ 5E PLANTED AT THE RELATIVE PROPORTIONS LISTED ON THE
<br />PLANT 50- FEDULE. TREES AND SHRUBS SHALL BE CLUSTERED AS SHOWN ON THE PLAN. COUNTS
<br />ARE PROVIDED FOR CALCULATION PURPOSES ONLY. IN THE CASE OF DISCREPANCIES NUMBERS
<br />SHOWN ON THE PLAN SHALL OVERRIDE THE IJJMBERS PROVIDED ON THE PLANT SC.I41EDULE.
<br />11. ALL 5U5TITUTION5 SHALL BE APPROVED BY LANDSCAPE ARCHITECT PRIOR TO PLANTIN6.PROPOSED
<br />SUBSTITUTIONS MUST BE NATIVE AND WILL ONLY BE ACCEPTED 5A5ED ON AVAILABILTY AND SITE CONDITIONS.
<br />12. TEMPORARY STOCKPILES THAT ARE NOT DISTURBED REGULARLY WILL BE SEEDED WIT14LUKLA
<br />PUBESCENT W4EAT62A55 AND /OR AMUR IMMEDIATE WHEAT6RA55 AT A RATE OF 15LI55 PL5 /ACRE,
<br />WITHIN 45 DAYS, WEATHER PERMITTING.
<br />13. 5EEDIW65 OF SPECIFIED NATIVE GRASS MIX WILL TAKE PLACE ONCE FINAL 6RADIN6 AND
<br />REPLACEMENT OF TOPSOIL HAVE BEEN COMPLETED FOR EACH PHASE.
<br />14. FORDS SPECIES LISTED IN THE SEED 564-+EDULE SHALL BE ADDED TO THE SEED MIX WIEAI
<br />SEEDING 5ERM5 AND AREAS AV_IACEKT TO THE TRAILS AND ADJACENT HOMES.
<br />15. SEEDING RATE5 SHALL BE DOUBLED WHEN SEED MIX IS HAND - BROADCAST.
<br />16. SEEDING SHALL TAKE PLACE BETWEEN LATE 5EPTEM5ER AND MID -APRIL TO ASSURE ADEQUATE
<br />51TE CONDITIONS FOR GEQMINATIOM. SEEDING SHAI_.I_. BE DONE IN UJ- FROZEN SOIL.
<br />17. QEVEGETATED AREAS WILL BE MULCHED WITH CLEAN, WEED -FREE STRAW OR NATIVE HAY. HAY
<br />SHALL BE APPLIED AT A RATE OF 4.000 L55 /ACQE AND CRIMPED INTO T14E SOIL. CRIMPING WILL
<br />BE DOME ALOK16 THE CONTOUR.
<br />PRUNE DEAD OR DAMAGED
<br />BRAKIGRE5 PRIOR TO PL.AKTING.
<br />IF FORM 15 COMPROMISED BY
<br />PRUNING, REPLACE SHRUB.
<br />SPACE PLAKTS AND SET PLUMB
<br />FOR 5E5T EFFECT.
<br />MOUND COMPACTED BACKFILL
<br />ENDER ROOT5ALL OR
<br />SET ON UNDISTURBFJD SOIL.
<br />REMOVE ALL COKTAINE125, 5A5KE
<br />WIRE ET6. FROM 2OOT5ALL
<br />SET SHRUB PLUMB.
<br />TOP OF ROOT BALL TO
<br />MATCH FIMI514 GRADE
<br />50 DEEP SHREADED CEDAR MULC44
<br />INSIDE SAUCER FOR ALL 51
<br />PREPARED BAC.KFILL MIXTURE
<br />I. ONE PART COMPOST
<br />OR APPROVED EQUAL.
<br />Q. TWO PARTS TOPSOIL.
<br />3. THREE PARTS NATIVE SOIL.
<br />4. MATERIALS TO 5E THOROUGHLY
<br />DIAMETER BLENDED.
<br />2-3 X5 BALL WIDTH
<br />SHIM PLANTING DETAIL
<br />NOT TO SCALE
<br />5 MIN
<br />II
<br />ZENI
<br />SEED WITH SPECIFIED
<br />NATIVE GRASS MIX AND E
<br />WATER TO ESTABLISH
<br />TYPICAL - TEMPORARY MINING BERM GROSS SECTION
<br />NOT TO SCALE
<br />1:1 (TYP.)
<br />{gzx >^
<br />s �
<br />EXISTIK16 TREE
<br />1
<br />EXISTING 5TRUGTLIRES
<br />1111111111 111111 m �
<br />• • r : I
<br />z z z z
<br />.t�� :.1�R1��YiiiE ...•....
<br />•• • .� .-
<br />.� .. .
<br />1111
<br />i i
<br />jlf
<br />EXI5TIN6 POWER POLE
<br />E
<br />EX15TIK16 OVERHEAD
<br />Q §-CW
<br />POWER
<br />6
<br />EXISTING 6A5 LINE
<br />DMG ADEQUACY RESPONSE
<br />6A5 MARKER
<br />KF
<br />PETROLEUM WELL
<br />U
<br />i. :r . • ••
<br />i � r •
<br />..nrn re
<br />�m
<br />4/15/05
<br />I:
<br />• • •..
<br />. • ..
<br />0�
<br />:. • .
<br />• . _ ..
<br />m�
<br />:.. ".119.
<br />:..
<br />• . . • . . •. -
<br />Mew
<br />wom
<br />1:1 (TYP.)
<br />{gzx >^
<br />s �
<br />NOTE:
<br />CIVIL RESOURCES, LL6. 15 NOT 2E5POIJ516LE FOR 5AFETY, IM, OM, OR ABOUT
<br />THE PROJECT 51TE, NOR FOR COMPLIANCE 5Y T14E APPROPRIATE PARTY OF
<br />AMY REGULATIONS THERETO.
<br />THESE MAP5 WERE PREPARED BY CIVIL RESOURCES, LL6. IN COOPERATION
<br />WITH 5W TKO JOINT VENTURE, LL6. 5W TKO JOINT VENTURE, LLG. WILL KEEP
<br />THE DIVISION OF MINERALS AND 6EOL06Y INFORMED OFAKIY GNAN6E5 TO THE
<br />MIMING OR RE61AMATIOM PLAN5 THROl!66l4 ANNUAL REPORTS AND FILE
<br />TECHNICAL REV151OM5 Al AMENDMENT APPLICATIONS A5 NECESSARY
<br />THROL16ROWIF THEM THE MIME.
<br />r
<br />�. c
<br />tDANMA ORTIZ DATE
<br />CIVIL RE50URCE5, LL6.
<br />i
<br />50'
<br />SETB
<br />11�
<br />EXISTIK16 TREE
<br />1
<br />EXISTING 5TRUGTLIRES
<br />1111111111 111111 m �
<br />PERMIT BOUNDARY
<br />z z z z
<br />.t�� :.1�R1��YiiiE ...•....
<br />-X-
<br />EXI5TIM6 WATER
<br />- - - -
<br />EXI5TIN6 I' C.MTOUR5
<br />jlf
<br />EXI5TIN6 POWER POLE
<br />E
<br />EX15TIK16 OVERHEAD
<br />Q §-CW
<br />POWER
<br />6
<br />EXISTING 6A5 LINE
<br />DMG ADEQUACY RESPONSE
<br />6A5 MARKER
<br />KF
<br />PETROLEUM WELL
<br />U
<br />i. :r . • ••
<br />i � r •
<br />..nrn re
<br />�m
<br />4/15/05
<br />I:
<br />NOTE:
<br />CIVIL RESOURCES, LL6. 15 NOT 2E5POIJ516LE FOR 5AFETY, IM, OM, OR ABOUT
<br />THE PROJECT 51TE, NOR FOR COMPLIANCE 5Y T14E APPROPRIATE PARTY OF
<br />AMY REGULATIONS THERETO.
<br />THESE MAP5 WERE PREPARED BY CIVIL RESOURCES, LL6. IN COOPERATION
<br />WITH 5W TKO JOINT VENTURE, LL6. 5W TKO JOINT VENTURE, LLG. WILL KEEP
<br />THE DIVISION OF MINERALS AND 6EOL06Y INFORMED OFAKIY GNAN6E5 TO THE
<br />MIMING OR RE61AMATIOM PLAN5 THROl!66l4 ANNUAL REPORTS AND FILE
<br />TECHNICAL REV151OM5 Al AMENDMENT APPLICATIONS A5 NECESSARY
<br />THROL16ROWIF THEM THE MIME.
<br />r
<br />�. c
<br />tDANMA ORTIZ DATE
<br />CIVIL RE50URCE5, LL6.
<br />i
<br />50'
<br />SETB
<br />11�
<br />EXISTIK16 TREE
<br />1
<br />EXISTING 5TRUGTLIRES
<br />1111111111 111111 m �
<br />PERMIT BOUNDARY
<br />z z z z
<br />.t�� :.1�R1��YiiiE ...•....
<br />-X-
<br />EXI5TIM6 WATER
<br />- - - -
<br />EXI5TIN6 I' C.MTOUR5
<br />jlf
<br />EXI5TIN6 POWER POLE
<br />E
<br />EX15TIK16 OVERHEAD
<br />Q §-CW
<br />r - - __7c7- - -�
<br />' SETBACK
<br />J I
<br />LEGEND:
<br />EXISTIK16 TREE
<br />NO.
<br />EXISTING 5TRUGTLIRES
<br />1111111111 111111 m �
<br />PERMIT BOUNDARY
<br />z z z z
<br />100 YR. FLOODPLAIM
<br />-X-
<br />EXI5TIM6 WATER
<br />- - - -
<br />EXI5TIN6 I' C.MTOUR5
<br />jlf
<br />EXI5TIN6 POWER POLE
<br />E
<br />EX15TIK16 OVERHEAD
<br />Q §-CW
<br />POWER
<br />6
<br />EXISTING 6A5 LINE
<br />DMG ADEQUACY RESPONSE
<br />6A5 MARKER
<br />KF
<br />PETROLEUM WELL
<br />U
<br />GAS /OIL EQUIPMEMT
<br />11 (TYP.)
<br />25'
<br />SETBACK I
<br />� ?
<br />EXISTIK16 TREE
<br />NO.
<br />EXISTING 5TRUGTLIRES
<br />DATE
<br />14I6H WATER LINE OF
<br />1
<br />RECLAIMED POMD5
<br />-X-
<br />FENCE
<br />fill
<br />TELEPHONE PEDESTAL
<br />ou a . awy
<br />EVERGREEN TREE5
<br />451 Oak Street, Suite 209
<br />CIVIL R E SOURCES, L L C P.O. Box 680 Frederick, CO 80530
<br />303 833 1416 (p) 303 833 2850 (f)
<br />DESIGNED BY: OF JOB NO. DWG:
<br />DRAWN BY: ARR /SR DATE: SEPT. 2004 DMG- Revised for Adequacy Response 4 -1 -05
<br />- SCALE: AS NOTED SHEET:
<br />CHECKED BY: DO 50,
<br />DECIDUOUS TREE5
<br />Q §-CW
<br />LARGE 51412-1,155
<br />o
<br />SMALL SHRUBS
<br />I
<br />l=
<br />r
<br />IM111111111
<br />North
<br />0 50 100' 200'
<br />SCALE: I"=100'
<br />Permit #: ') > Confdental?: Q;
<br />Class: ,til } MV#
<br />From:
<br />Doc. Name: 1be,> , e( 4
<br />Doc. Date (if no date'stamp): q-15 M- Section /Exh
<br />Inspection Date Specialist:
<br />LUP70N LAKES RESOURCE,
<br />PT. LUP70N SPECIAL USE PERMIT AND
<br />MLRB 112 RECLAMATION PERMIT M- 2004 -078
<br />MINING LANZ)51SA E FLAN
<br />SW TKO JOINT VENTURE, LLG
<br />NO.
<br />REVISIONS
<br />DESCRIPTION
<br />DATE
<br />BY
<br />1
<br />REVISIONS PER SW TKO
<br />1119104
<br />DF
<br />2
<br />NAME CHANGE PER DMG
<br />12/20/04
<br />OF
<br />451 Oak Street, Suite 209
<br />CIVIL R E SOURCES, L L C P.O. Box 680 Frederick, CO 80530
<br />303 833 1416 (p) 303 833 2850 (f)
<br />DESIGNED BY: OF JOB NO. DWG:
<br />DRAWN BY: ARR /SR DATE: SEPT. 2004 DMG- Revised for Adequacy Response 4 -1 -05
<br />- SCALE: AS NOTED SHEET:
<br />CHECKED BY: DO 50,
<br />3
<br />4
<br />PERMIT NO. CHANGE PER DMG
<br />FT LUPTON SPECIAL USE
<br />1/27/05
<br />3/24/05
<br />DF
<br />SR
<br />5
<br />DMG ADEQUACY RESPONSE
<br />3/28/05
<br />KF
<br />6
<br />NAME CORRECTION
<br />4/8/05
<br />KF
<br />7
<br />ADE UACY REST NSE
<br />4/15/05
<br />KF
<br />Permit #: ') > Confdental?: Q;
<br />Class: ,til } MV#
<br />From:
<br />Doc. Name: 1be,> , e( 4
<br />Doc. Date (if no date'stamp): q-15 M- Section /Exh
<br />Inspection Date Specialist:
<br />
|