Laserfiche WebLink
<br />CALDWELL - NESSELHUF PIT <br />ESTIMATED RECLAMATION COST TOTAL RECLAMATION COST FOR <br />PER UNIT THIS PROJECT <br />1. Grass Seed Mix <br />2. Scarify <br />3. Fertilizer - 40 #/A <br /> Available N&P <br />4. Topsoiling w/front- <br /> end loader, dozer <br /> or grader <br />5. Fertilizer Application <br /> Equipment and Labor <br /> Rate <br />6. Weed Control <br />7. Mulch <br />8. Spread Mulch <br />TOTAL COST: <br />CONTINGENCY: <br />COST PER ACRE: <br />UNIT TOT. UNIT TOT. COST <br />50.00 92 AC $ 4,600.00 <br />35.00 92 AC $ 3,220.00 <br />12.00 92 AC $ 1,104.00 <br />.50 C.Y. 10000 C.Y. $ 5,000.00 <br />20.00 92 AC $ 1,840.00 <br />12.00 92 AC $ 1,104.00 <br />140.00 92 AC $12,880.00 <br />35.00 92 AC $ 3,220.00 <br />$32,968.00 <br />$ 6.058.20 <br />$39,026.20 <br />$ 424.20 <br />