My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE130439
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE130439
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:31:23 PM
Creation date
11/25/2007 10:22:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 48 HAUL ROAD FOR BATCHWAY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Therefore, an undrained shear strength of 750 psf was assumed for these subgrade materials. In addition, <br />Tensar geogrid reinforcement will be placed a[ the base of the imported till materials and an angle of <br />internal friction of 25 degrees was assumed for this material placed and compacted [o at least 95 90 of the <br />maximum modified Proctor density in accordance with ASTM D1557. In accordance with the geogrid <br />manufacturer's ruommenda[ions, anincrease in undrained soil shear strength of Z.0 is assumed in the <br />analysis for the underlying subgrade soils. <br />Based on the available information and the assumptions stated above, it appears that the roadway should <br />have a mutimum factor of safety on the order of 2.0 for shallow failures within the embankment fill <br />materials. For deeper seated failures within the subgrade soils, it appears [hat the roadway should have a <br />minimum factor of safety on the order of 1.7. Results of the stability analyses is shown in Appendix A. <br />These values are based on the proposed construction and the assumptions given above. Variations in the <br />loading conditions (static versus dynamic), soil profile and corresponding strength values may change <br />with time or be different from [hose assumed. We do not guarantee the stability of [he embankment, <br />only that our work meets the standard of care in our profession. If you have any questions regarding [his <br />letter or stability analysis, or if we may be of further service, please contact this office. <br />Sin <br />NO <br />• <br />Hai <br />Rey <br />u <br />APPROVED NOV 2 4 1997 <br />lob No. 97-3325 Nonhwesr Colorado Consul~enu, Inc. page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.