Laserfiche WebLink
<br />EZHIBIT L <br />RECLAMATION COSTS <br />The Table of Distu <br />selected a point in <br />This point is at the <br />involves backfilling <br />Ha or Disturbance <br />rbance in Exhibit D and this Exhibit have <br />the mining where disturbance is maximized. <br />beginning of mining in Phase 1 where the pit <br />of four walls. <br />~.'06t/ <br />Amount Units Unit Cost <br /> <br />1. I <br />Mobilization/Demobilization) 2 I <br />I EA i <br />IS400.00 I <br />IS 800.00 <br /> <br />2. <br />Remove abandoned equipment I <br />I I <br />I I <br />I I <br />I <br /> ar.~d buildings 1 1 I <br />I EA <br />I IS1,000.001S 1,000.00 <br />I I <br />3. Bac:kfill slopes of 8 acre I I I I <br /> mining area from over- I I I I <br /> burden stockpile 1~1 to 1 I I I <br /> 3~]. and 2~1, 4 faces at I I I I <br /> 2,400 L.F. 138,489 <br />I 1 CY <br />I IS .80 <br />I IS30,791.20 <br />I <br />4. Plaice and compact clay I I I I <br /> core, 2,400 L.F. 117,333 <br />I 1 CY <br />I 1S 1.25 <br />I IS21,666.25 <br />1 <br />5. Scarify overburden stock- I I I I <br /> pile area, .3 acres 114,520 <br />I 1 SY <br />I 1 S .15 <br />I IS 2,178.00 <br />I <br />6. Spread topsoil at 6" to I I I I <br /> 10" stripped area-3 acres. I I I I <br /> Setback and slope-1.6 I I I I <br /> acres 1 7,891 ( CY <br />I IS .80 <br />1 IS 6,312.80 <br />I <br />7. Seeding, fertilize, mulch I <br />I I I I <br /> 7.ti acres 1 7.6 <br />I 1 AC <br />I IS500.00 <br />I IS 3,800.00 <br />I <br /> <br />SUBTOTAL I I I I <br />IS66,548.25 <br />L-1 <br />