Laserfiche WebLink
<br />EXHIBIT E <br />Reclamation will begin by removing fill materials, consisting of <br />top soil and gravel, that formed a small portion of the original <br />pit's north rim. This fill material plus remaining amounts of top <br />soil will be scattered in the central pit area. Most steep em- <br />bankments will be graded down to slope not exceeding a 2:1 ratio. <br />Perimeter contouring will conform to existing hillsides. Inner <br />contouring will provide a gentle south to north trending drainage <br />through the pit and its north rim to help minimize landslide <br />probabilities. Large boulders will be placed in the steep north wash <br />to retard erosion and protect the dense brush-grass-tree cover now <br />existing. yit area will be seeded as recommended by the 3havano <br />Soil Conservation Service. <br />