Laserfiche WebLink
<br />~ u <br />• INTRODUCTION <br />Water Engineering & Technology, Inc. (WET) has evaluated the hydrologic response of Ponds A, <br />D, and G at the Eckman Park Mine. This reevaluation was prompted by review comments that you received <br />from the Colorado Mined land Reclamation Division (MLRD) in a letter dated 9 February 1989. The <br />following sections describe the work that we performed and the procedures and/or assumptions, used in <br />these analyses. <br />It should be emphasized that certain components of this analyses rely solely on information available <br />from existing as-built plans and spec cations for the ponds. In particular, configurations for the principal <br />outlet works, including riser elevations and sizes, pipe lengths and flow line elevations, as well as stage- <br />capacity curves for each pond were obtained from the certified as-built drawings. Our work has not <br />included field verification or surveying of any of these facilRies. <br />HYDROLOGY <br />General <br />• Drainage areas for the contributing areas to each of Ponds A, D, and G were digitized using <br />1'=1000' topographic mapping. The drainage areas are shown in Attachment 1. Drainage areas for Ponds <br />A, D and G are 3370, 918 and 440 acres, respectively. Since the drainage area for Pond A is within 2 <br />percent of the value used in previous hydrologic analyses, the inflow hydrographs for this pond were not <br />re-evaluated. The drainage areas for Ponds D and G differ more appreciably from values used in previous <br />analyses. Consequently, hydrologic analyses were conducted for these drainage basins using procedures <br />provided in Peak Flows in Colorado and unit hydrograph procedures provided in National Enoineerino <br />Handbook 4 - Hvdroloov. <br />Hydrologic routing of the flow through each pond was performed using the Corps of Engineers <br />HEC-1 model. The stage-storage curves were dbtained by digRizing values from the as-built drawings. <br />Discharge through the principal outlet works was determined using a Lotus spreadsheet model that we <br />developed using procedures outlined by Jachens (1989) in a paper titled Computer Aided Pioe Droo Design. <br />The Lotus model considers the controlling factors of flow through the riser perforations, weir flow over the <br />riser, orifice Bow in the riser, orifice flow in the outlet pipe and full pipe flow in the outlet pipe. Tailwater <br />effects are considered in the full pipe flow calculations. For all of the computations provided here, it was <br />assumed that the tailwater elevation equalled the top of the downstream end of the outlet pipe. <br />Flow out the emergency spillways was computed using a weir equation with a discharge coefficient <br />• of 2.8. Results were combined with the flowrates through the principal outlet works to develop stage- <br />Water Engineering & Technology, Inc. <br />