Laserfiche WebLink
~~ <br />EXHIBIT L <br /> <br />Reclamation Costs for thA. kelbur Pft <br />Cost information is based o `.':the average costs listed per <br />acre in the Soil Conservation,~~rvice Great Plains <br />Conservation Program Cost Dock for March 1, 1981 <br />Item <br />Unit <br />Unit Price <br />Topsoil Removal I Cubic Yard ~ 0.60 <br />Topsoil Application Cubic Yard 0.60 <br />Shaped 8 Grading Per Acre 500.00 maximum <br />Tillage 8 Seedbed Per Acre 12.00 <br />Cover Crop Per Acre 6.00 <br />Fertilizer Per Acre 25.00 <br />Grass Seeding Per Acre 25.00 <br />Weed Control Per Acre 4.00 <br />Terraces FT .55 <br />