My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE130367
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE130367
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:31:20 PM
Creation date
11/25/2007 10:19:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
8/29/2005
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Wadge Seam will be mined out and production will gradually decline during the last few years. The estimated <br />. mine life, based on maximum annual peak production of 10,000,000 tons, is 11 years. The actual mine life is subject to <br />extension or reduction in case of either very weak or strong coal markets, resulting in reduced or increased yeazly <br />production. <br />Productivity estimates were based on expected mining conditions and analysis of productivities at other western <br />U.S. mines. It is expected that gradient and water inflows will significantly reduce down-dip development <br />productivities. It is assumed that six continuous miners and two longwalls will be required to reach maximum <br />yearly production. The continuous miner productivities would vary from 200,000 to 325,000 tons per yeaz per unit <br />depending on location. Longwall productivity is expected to be approximately 6,000,000-9,000,000 tons per yeaz <br />per unit. <br />Labor Force <br />The Foidel Creek Mine Labor force schedule is shown in Table 47, Labor Force Schedule, Table 48, Hourly Labor <br />- Maximum Production, and Table 49, Salaried Labor -Maximum Production. The total employee numbers <br />increase from an estimated 47 in 1983, for aone-section mine, to 497 in 1992, at full production. The current work <br />force is approximately 370 people (1998). <br />Mining Eauinment <br />The Foidel Creek Mine will use standazd mining methods and equipment commonly used in the western U.S. coal <br />industry. <br />A longwall section will contain the following representative list of equipment: <br />• 174 Shield Roof Supports <br />Armored Face Conveyor <br />Shearer <br />Stage-Loader <br />Electrics <br />Hydraulic System <br />Miscellaneous Pumps and Tools <br />A typical continuous miner section will contain the following equipment: <br />Continuous Miner <br />Shuttle Cars <br />Roof Bolter <br />Feeder-$reaker <br />Electrical Load Center <br />Mantrip Vehicle(s) <br />LHD Scoop <br />Parts Caz <br />Continuous Haulage System <br />Rock Duster <br />Miscellaneous Pumps and Tools <br />The following types of utility and support equipment will be utilized in the Foidel Creek Mine (both underground <br />and surface): <br />Mine Ventilation System <br />Electrical Distribution System <br />Production Water Supply System <br />Conveyor Systems <br />MROS-194 2.05-10 07/2/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.