My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE130350
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE130350
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:31:19 PM
Creation date
11/25/2007 10:19:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001085
IBM Index Class Name
Permit File
Doc Date
11/20/2001
Doc Name
FN M-2001-085 ADAMS CNTY RV PARK LLC DBA 124TH ESTATES PARTNERS 124TH ESTATES SAND & GRAVEL DMG RECL
From
DMG
To
ADAMS CNTY RV PARK LLC DBA 124TH ESTATES PARTNERS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 11/07/2001 <br />User: ESC <br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />State : Colorado <br />County :Adams <br />Site :124Th Estates <br />Agency or organization name :Rip Shale From Pit Floor To Construct Pond Liner <br />Permit or other job action :New 172 Permit Application <br />Task description :Rip shale from pit floor to construct pond liner <br />HOURLY EQUIPMENT COST <br />Selected estimating method <br /> Utilization <br />Cost Breakdown : Ownership cosVhour : $54.81 NA <br />Dozer operating cosUhour : $95.93 100 <br />Ripper operating cosVhour : $17.83 100 <br />Operator cosUhour : $27.99. NA <br />Total unit cost/hour : $190.55 Total fleet cosUhour <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Selsmlc : 175,000 BCY Load factor <br />Area : NA acres Rip depth (H) <br />Basic machine : Cat D9R - 9SU <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 1-shank upper <br />Source of estimated quantity :Operator Estimate <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity : 4,500 feeUsecond <br />Unadjusted production : 1,11750 cu. yds./hour <br />Area : Avg. ripping depth <br />Average ripping width <br />Average ripping length <br />Average dozer speed <br />Average maneuver time <br />Production per unit area <br />Unadjusted production <br />NA feeUpass <br />NA feeUpass <br />NA feeUpass <br />NA feeUminute <br />NA minuteslpass <br />NA acres/hour <br />NA cu. yds./hour <br />NA Bank volume : 775,000 BCY <br />NA Volume : NA BCY or CCY <br /> <br /> <br />;ondition Correction Fact ors - <br />Unadjusted production <br />per selected method : 1,11750 cu. yds./hour <br /> <br />Site altitude : 5,030 feet <br />Altitude adjustment : 1.00 (Caf HB) <br />Job efficiency factor : 0.83 (1 shiR/day) <br />Net job correction : 0.83 multiplier <br /> <br />Adjusted unit production <br />Adjusted tleeT production <br />JOB TIME AND COST <br />Fleet size : 1 dozers) Total job time <br />Unit cost : $0.205 per cu. yd. Total job cost <br />Horsepower: 405 <br />Shill basis : 1 per day <br />3190.55 <br />Seismic <br /> <br />Permitljob # : M-2001-085 <br />Abbreviation :none <br />Filename ; M085-002 <br />Data source : (CRC) <br />927.52 <br />927.52 <br />188.67 <br />$35,952 <br />cu.yds.lhour <br />cu. yds./hour <br />hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.