My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE130333
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE130333
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:31:18 PM
Creation date
11/25/2007 10:18:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Permit File
Doc Date
3/1/2007
Doc Name
2006 Neckpit Slide Remediation Plan
Section_Exhibit Name
Tab 20 Attachment 20-B
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
data and specifications included in Appendix C. The Enkamat 7020 covered area will be non-soil ftlled • <br />except in the area of the permanent channel, which would be sod filled to promote greater stability and <br />reduce the potential for erosion. The soil filled channel will be v-shaped approximately 0.6 feet deep <br />and a minimum of 6.0 feet wide (see Figure 3, B-B' Cross Section). The entire area will be broadcast <br />seeded with the approved Seedmix #1. The existing half-round pipe will be reinstalled along the <br />drainage channel to handle flows from culvert PM-11 until Channel PM-4D has sufficient vegetation <br />established, then the half-pipe will be removed. There will be a surge pool/energy dissipater established <br />at the bottom of channel PM-4D containing riprap (Dso 6'~ to reduce the high velocity outflow (see <br />Figure 1, 2006 Neckpit Landslide Remediation Plan View). <br />The postmine channel design fox channel PM-4D is summarized as follows: <br />• Runoff was calculated fora 10-year, 24hour storm event <br />- Calculated peak runoff from a 10-yr/24hr event through culvert PM-11 is 3.7 cubic feet per <br />second (cfs) and in the lower reach of channel PM-4D is 4.2 cfs. <br />- A minimum culvert diameter calculated for PM-11 is 12 inches. <br />• Channel PM-4D has been designed as a vegetated channel with the ability to withstand runoff • <br />velocities of 20 feet per second (fps). <br />• An energy dissipater will be constructed at the outflow of postmine channel PM-4D. <br />The calculated Dso for the rock in the energy dissipater is 6 inches. <br />The SEDCAD demonstrations for culvert PM-1 ] and postmine channel PM-4D ate included in <br />Appendix B. <br />• <br />TR-55 20-B.2 12/06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.