Laserfiche WebLink
Reynolds Pit <br />DMG 112 Application <br />Exhibit L -Reclamation Costs <br />Earthwork: High-wall reduction 25ft vert. to 3:1 slope x 800ft 1.33 swell = 9,23b cy <br />Cat D9R estimated at 1019 cy/hr@ $180/hr = $1,632 <br />Rip 18 acres Cat 14H grader @ $]08/hr x 1 ac/hr x 18 = $1,944 <br />Replace overburden Cat 633E Series2 Scraper @$401/hr x <br />6" on 17 acres 13,713cy/1320 cy/hr for 400 foot avg haul = $4,166 <br />Replace topsoil Cat 633E Series2 Scraper @$401/hr x <br />6" on 17 acres 13,713cy/1320 cy/hr for 400 foot avg haul = $4,166 <br />Grade 18 acres Cat 14H grader @ $108/hr x 18ac/1.3 ac/hr = $1,495 <br />Remove haul road Cat 633E Series2 Scraper @$401/hr x <br />1,600cy/1320 cy/hr for 400 foot avg haul = $486 <br />Seeding and mulch Assume $500/acre, 18 acres <br />50% failure rate = $13,500 <br />Mobilization 2 miles one way, includes seeding equip. _ $1,000 <br />Subtotal = $28,389 <br />Overhead and Profit Subtotal x 17% = 4 826 <br />Total Contract = $33,215 <br />DMG Management 5% of Total Contract = $ 1,661 <br />Total Bond Amount = $34,876 <br />