Laserfiche WebLink
E. GENERAL MOMTORING, SAMPLING AND REPORTING REQUIIIEMENTS <br />4. Records <br />a. <br />b. <br />c. <br />d. <br />e. <br />f. <br />B• <br />PARTI <br />Petvtit No. CO-0029599 <br />Page No. 18 <br />I <br />The permittee shall establish and maintain records. Those records shall include the following: <br />original strip chart recordings for continuous monitoring instrumentation, all calibration and maintenance records, <br />copies of all reports required by this permit and records of all data used to complete the application for this permit. <br />This period of retention shall be extended during the course of any unresolved litigation regarding ttie discharge of <br />pollutants by the permittee or when requested by dre Division or EPA. <br />The petmittee shall retain for a minimum of three (3) years records of all monitoring informarion, including all <br />• <br />The date, type, exact location, and time of sampling or measurements; <br />The individual(s) who performed the sampling or measurements; ~ <br />The date(s) the analyses were performed; <br />The individual(s) who performed the analyses; <br />The analytical techniques or methods used; <br />The results of such analyses; and ~ <br />Any other observations which may result in an impact on the quality or quantity of the discharge as indicated in <br />40 CFR 122.44 (i)(1)(iii). <br />5. Flow Measurine Device <br />If not already a part of the permitted facility, within ninety days after the effective date of the permit, a flow <br />measuring device shall be installed to give representative values of effluent quantities at the respective discharge <br />points. Unless specifically exempted, or modified in Part I.E.S of this permit, a flow measuring device will be <br />applicable at all designated discharge points. ~ <br />I <br />At dte request of the Division, the permittee shall show proof of the accuracy of any flow-measuring device us <br />obtaining data submitted in the monitoring report. The flow-measuring device must indicate values iwithin ten (1 <br />percent of the actual flow being discharged from the facility. ~ <br />6. Sipuatorv and Certification Requirements <br />a. All reports and other information required by the Division, shall be signed and certified for accuracy by the <br />petmittee in accord with the following criteria: ~ <br />iv) In the case of a municipal, state, or other public facility, by either a principal executive officer, ranking <br />elected official, or other duly authorized employee. <br />b. All reports required by permits, and other information requested by the Division shall be signed by a person as <br />described above or by a duly authorized representative of that person. A person is a duly authorized <br />representative only if; i <br />i) In the case of corporations, by a principal executive officer of at least the level of vice-president or his or <br />her duly authorized representative, if such representative is responsible for the overall operation of the <br />facility from which the discharge described in the form originates; <br />ii) In the case of a partnership, by a general partner; <br />iii) In the case of a sole proprietorship, by the proprietor; ~ <br />i) The authorization is made in writing by a person described above; ' <br />i <br />ii) The authorization specifies either an individual or a position having responsibility for the overall operarion <br />of the regulated facility or activity such as the position of plant manager, operator of a weft or a we[l Piet <br />superintendent, position of equivalent responsibility, or an individual or posttion having overall <br />responsibility for environmental matters for the company. (A duly authorized representati ie may thus <br />either a named individual or any individual occupying a named position); and, <br />