Laserfiche WebLink
<br />-3- <br />b) The Board will enter the lands to perform reclamation only if the Board has <br />determined: <br />i. that reclamation required by law to have been performed upon such lands <br />has not been performed, and <br />u. that financial warranty forfeiture proceedings descn'bed in the Act or <br />similar provisions of subsequent laws, if any, have been initiated. <br />c) The Division, acting for the Board, will enter Iands to respond to an emergency only <br />where the Division determines that any of the conditions of Construction Material Rule 8.4.2. exist. <br />7) The additional conditions set forth in the attached rider, if any, are incorporated herein by <br />reference. <br />/_/ a) Rider is attached. <br />/ XX / b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />MICHAEL NG <br />Division Director <br />