My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE130112
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE130112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:31:06 PM
Creation date
11/25/2007 10:10:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
NH1 TAB 7 APPENDIX 7-6 NPDES Permit No. CO-0000213
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART II <br />Page 15 of 19 <br />• B. RESPONSIBILITIES <br />1. Inspections and Right to Entry <br />The permittee shall allow the Director of the State Water Quality <br />Control Division, the EPA Regional Administrator, and/or their <br />authorized representative, upon the presentation of credentials: <br />(A) To enter upon the permittee's premises where a regulated facility <br />or activity is located or in which any records are required to be <br />kept under the terms and conditions of this permit; <br />(B) At reasonable times to have access to and copy any records <br />required to be kept under the terms and conditions of this permit <br />and to inspect any monitoring equipment or monitoring method <br />required !n the permit; and <br />(C) To enter upon the permittee'e premises to investigate, within <br />reason, any actual, suspected, or potential source of water <br />pollution, or any violation of the Colorado Water Quality Control <br />Act. The investigation may include, but is not limited to, the <br />following: sampling of any discharge and/or process waters, the <br />taking of photographs, interviewing pecmittee staff on alleged <br />violation, access to any and all facilities or areas within the <br />• permittee's premises that may have any affect on the discharge, <br />permit, or alleged violation. <br />(D) The Division shall split a sample with the permittee if requested <br />to do so by the permittee. <br />2. Duty to Provide Information <br />the permittee shall furnish to the Division, within a reasonable time, <br />any information which the Division may request to determine whether <br />cause exists for modifging, revoking and reissuing, or terminating this <br />permit, or to determine compliance with this permit. The permittee <br />shall also furnish to the Division, upon request, copies of records <br />required to be kept by this permit. <br />3. Transfer of Ownership or Control <br />A permit may be transferred to a new permittee if: <br />(a) The current permittee notifies the Division in writing 30 days in <br />advance of the proposed transfer date; and <br />(b) The notice includes a written agreement between the existing and <br />new permittees containing a specific date for transfec of permit <br />• responsibility, coverage and liability between them; and <br />Code: 1 - 29 Date: 1 - 84 <br />7-6-23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.