Laserfiche WebLink
PART I <br />Page 6 of 19 <br />• E. SPECIAL REQUIREMENTS <br />1. Materials Containment Plan <br />Pursuant to Sections 6.9.3 (5) and (6)(b) of the Regulations for the <br />State Discharge Permit System, the permittee is required to submit a <br />Materials Containment Plan. Such a plan shall be submitted to the <br />Permits and Enforcement Section, Water Quality Control Division within <br />ninety (90) days after the effective date of this permit. The plan <br />shall include information and procedures for the prevention and <br />containment of spills of materials used, processed or stored at the <br />facility which if spilled would have a reasonable probability of having <br />a visible or otherwise detremental impact on waters of the State 1/ <br />2/. The plan shall include, but sot necessarily be limited to the <br />following: <br />a. A history of spills which have occurred in the three (3) years <br />preceeding the effective date of this permit. The history shall <br />include a causation of the spills and a discussion of preventative <br />measures designed to prevent them from reoccurring; <br />b. A description of the reporting system which will be used to notify <br />responsible facility management, the State Water Quality Control <br />• Division, the Environmental Protection Agency, downstream water <br />users within 5 miles downstream of the facility, and local health <br />officials; <br />e. A description of preventative facilities (including overall <br />facility plot) which prevent, contain, or treat spills and <br />unplanned discharges; <br />d. A list which includes the volumes or quantities of all materials <br />used, processed, or stored et the facility which represent e <br />potential spill threat to surface waters. The location of scored <br />material shall be indicated on the facility plot submitted for Item <br />c; <br />1/ If there is no such material present at the site, this shall be indicated <br />in writing and submitted to the Division for review. <br />2/ If there is material present but the permittee feels there is not a <br />reasonable probability of a spill impacting waters of the State, this shall <br />be documented in writing and submitted to the Division for review. This <br />documentation shall include; 1) distance to nearest surface waters, and; 2) <br />a detailed description of any structure which prohibits the release of <br />material onto the ground or into a conveyance system. <br />Code: f - 20 Date: 1 - B4 <br />7-6-14 ~ <br />