My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE130094
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE130094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:31:05 PM
Creation date
11/25/2007 10:10:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996008
IBM Index Class Name
Permit File
Doc Date
6/18/1996
Doc Name
ADEQUACY REVIEW WESTERN GRAVEL INC FILE M-96-008
From
DMG
To
EARTH STONE LTD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• III IIIIIIIIIIIII III • <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Resources <br />1713 Sherman 6t., Roam 215 <br />Denver, Colorado 80203 <br />Phone: (3031 866 3567 <br />FA%: 13031 832-A 106 <br />June 18, 1996 <br />Mr. Milan Hauxby <br />Earth/Stone, Ltd. <br />P. O. EOX 781 <br />Delta, CO 81416 <br />RE: ADEQUACY REVIEW -Western Gravel, Incorporated -File No. M-96-008 <br />Dear Mr. Hauxby: <br />~I~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />tames 5. Lochhead <br />Execulrve Dim wi <br />Michael B. Lung <br />Division Direr iw <br />The Division has reviewed your permit application and has the following Adequacy concerns: <br />E7CI-IIBIT D-Mining Plan <br />On Page 4 it is stated that "a river crossing, either by bridge and/or conveyor, located on <br />the northeast side of the site, will be constructed and also used for access and transporting <br />materials from the site". <br />On Page 10, under stream crossing, it is stated "If a bridge is installed, it will remain upon <br />completion of the operation for use by the landowners. If a conveyor is erected and used <br />to transport material across the river, it will be removed as part of the reclamation plan". <br />The Division, in order to evaluate the financial warranty, requires the following <br />information: <br />1) Is a conveyor system going to be erected to transport the material? <br />If so, please submit a detailed design, which includes length and <br />width and associated support structures. <br />2) Please submit the approved plan from the Army Corps of Engineers <br />for the bridge. <br />EXI-IIBIT E-Reclamation Plan <br />Under [he legal description and the Phase I and II areas' acreage, the permit is for 37.41 <br />acres. However, on the reclamation plan, the breakdown is as follows: 24.25 acres as <br />
The URL can be used to link to this page
Your browser does not support the video tag.