My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE130075
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE130075
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:31:03 PM
Creation date
11/25/2007 10:08:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997086
IBM Index Class Name
Permit File
Doc Date
2/13/1998
Doc Name
BEDROCK MINE PN M-97-086 PUBLIC HEARING FOR APPLICATION DECISION
From
DMG
To
FERD MUELLER
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />Mr. Ferd Mueller <br />January 14, 1998 <br />2. The operator will not slab mine within 200 fee[ of any significant, valuable, or <br />permanent man-made structure until the operator submits to the Division one of the <br />following items: <br />1. Provide a notarized agreement between the applicant and the person(s) having <br />an interest in the structure, tha[ the applicant is to provide compensation for <br />any damage to the structure. <br />2. Where such agreement canno[ be reached, the applicant shall provide an <br />appropriate engineering evaluation that demonstrates that such structure shall <br />not be damaged by activities occurring at the mining operation. <br />This stipulation shall not prevent the operator from conducting surface rock removal <br />activities as defined in the approved permit application within the structural buffer <br />zone of 200 feet. <br />3. No blasting will be conducted on site until the applicant submits and receives approval <br />for a blasting plan that cleazly demonstrates through appropriate blasting, vibration, <br />geotechnical, and structural engineering analyses, that off-site azeas will not be <br />adversely affected by the proposed blasting. <br />The amount of financial warranty set by the Division for this operation is $26,100.00. The Mined Land <br />Reclamation Boazd will review Staff s recommendation for approval during the February 25-26, 1998 Boazd <br />Meeting and make a final decision for approval or denial at that time. <br />PLEASE NOTE THAT MINING OPERATIONS MAY NOT COMMENCE UNTIL A PERMIT HAS <br />BEEN ISSUED BY THE DIVISION AND AFTER RECEIPT OF YOUR FINANCIAL WARRANTY <br />AND PERFORMANCE WARRANTY. <br />If you have any questions, please contact me. <br />Sincerely, <br />,.~-~a w~ <br />Anthony J. Waldron <br />Environmental Protection Specialist <br />Enclosure <br />AI:IOSSIPMMITEIIPIMAP17086.A1 W <br />
The URL can be used to link to this page
Your browser does not support the video tag.