Laserfiche WebLink
Revegetation <br />Includes site preparation, seeding. and contour furrowing. <br />Historic cast - 5611/acre <br />Work Requirements <br />Railroad bed removal and backfilling - Assumptions <br />\ 1) 5400 CY to be used in backfilling <br />2) 5800 CY of topsoil to be replaced <br />3) Revegetation - 2 acres <br />~4) Ditch Grading - 650` <br />Cost Estimate <br />A. Backf'~ ng arsd~grading <br />5000 CY 6 hrs. <br />84D LC r. <br />6 hrs. x 5293.59/hr. = 51,761.54 <br />2 acres <br />1 ac/hr, 2 hrs. <br />2 hrs. x 5199.75 = 5399.50 <br />B. Topsoil Redistribution <br />5000 CY -~ <br />= 7 hrs. <br />798 LCY/hr. <br />7 hrs. x 5534.54/hr. = 53,741.78 <br />C. Revegetation <br />2 acres x 5611/ac = 51.227 <br /> <br />780-141<c) Revised 02/ZD/87 <br />