Laserfiche WebLink
Correction Factors: <br />~ Excellent Operator - 1 <br />Material - .80 <br />Job Efficiency - .84 <br />Adjusted Production = Maximum Production x Correction Factors <br />(1250 LCY/hr.) (1)(.80)(.84) <br />= 840 LCY/hr <br />657 Scraper - Unadjusted Production - 950 CY/hr <br />Correction Factors: <br />Job Efficiency - .84 <br />Adjusted Production = Maximum Production x Correction Factors <br />_ (950 CY/hr.) (.84) <br />= 798 CY/hr. <br />16-G Motor Grader <br />Production - One acre/hr. <br />Cost Estimates for Equipment <br />Assumptions <br />1) One day to complete project <br />2) Daily rental rate apply <br />3) Reference - Blue Book Rental Rate <br />D9L Dozer <br />Daily Rental Rate - S1.735 <br />Area Correction Factor - 1.08 <br />Actual Rental Rate <br />51,735/day x 1.08 = 51,873 <br /> <br />780-141(a) Revised 02/20/87 <br />