Laserfiche WebLink
Section 780.21(6) -Continued <br />• Sedimentation ponds will be monitored in accordance with the current NPDES permits. Copies of the <br />DMRs will be forwarded to the Division. Each sedimentation pond will have a staff gage installed for <br />monitoring of water and sediment level. <br />/ T/1e fallowing text in Section 780.11(c), through page 780-101, addressing the probable hydrologic <br />nmsequences of mining, is retained in the permit document for historical reference. The current text <br />discussion njPHC begins on page Permit Reuewal 780-144-13. / <br />(c) The description shall include a determination of the probable hydrologic consequences of the proposed <br />mine plan area and adjacent area with respect to the hydrologic regime and the quantity and quality of water in <br />surface and groundwater systems under all seasonal conditions, including the contents of dissolved and total <br />suspended solids, total iron, pH, total manganese, and other parameters required by the regulatory authority. <br />Probable consequences of mining on the hydrologic balance have been evaluated based on data <br />• accumulated for the baseline monitoring program presented and referenced under Sections 779.15, 779.16, <br />and the proposed mining and reclamation plans submitted under Sections 780.12, 780.14, 780.18, 780.23, <br />and 780.25. Tlie methods of analysis included a determination of baseline levels of quantity <br />• <br />1996 Permit Ren. Petmit Renewal 780-175 Revised 2/10/97 <br />