Laserfiche WebLink
r <br />C'o-l~+~--~'~ <br />STATE CJF <br />OFFICE Of THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />~~' 8 <br />~~'pe <br />~/8 6~ <br />7373 Sherman Street, Room 878 ~p/s/o ~ ~~tIJ <br />Denver, Colorado 80203 a ~f <br />FAX (3 3~8b6-358987 Response to Reclamation Permit Application Consideration Mere/a anp 0~/a8r <br />wtaw.waterstate,m.us <br />DATE: March 18, 2005 <br />TO: G. Russell Means, );nvironmental Protection Specialist <br />CC: Division 4 Office; District 41 Water Commissioner <br />aill owers <br />Russell Ceorae <br />Executive Director <br />Hal D. Simpson, P.E <br />Stale Engineer <br />FROM: Cynthia J. Love, Water Reso7>rce Hngineer C~,s~ <br />RE: Operator; Nick H. Gray, Gray Pit #2, File No. M-2005-012"~ <br />Section 36, Twp 49N, Rng 8W, N.M. P.M., Montrose.County ._ <br />Landowner- Nick H. Gray ~ - • ~ <br />CONDITIONS FOR APPROVAL u:~ ~,. <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground water [Host not <br />occur during or after mining operations. .. , <br />^ The proposed operation will COt7SllIIle ground water by ^evaporation, ^dust control, ^reclamation, ^waler <br />removed in the mined product, ^processing, Qother: <br />Prior to initiation of these uses of ground water, the apglicam will need to obtain tither a gravel pit or other type <br />of well permit, as applicable. Prior to obtaining a permit, an approved water supply plan or decreed plan for <br />augmentation is required. <br />(] Prior to appmviag a well pemrit, the applicant must conduct a field inspection of tHe, site and document the- ; _.. <br />locations of all wells within 600 feet mile of the permit area. The applicant t7atstthen obtain a waiver of .- <br />objectioA from all well owners with wells within 600 feet of the pemdt area or, contact this office regarding the <br />600 foot spacing notificatiortibearing process. , <br />^ The proposed operation may have potemial impact on existing water rights near the project location. Please <br />provide evidence that the proposed project will not alter or impact the historic operation of existing water rights. <br />The applicant has indicated plans to use other water for: Dust suppression at the permit site.. Tltc;applicant has , <br />indicated that he has irtig8tion water available foi this use. The apglic~ant will teeed to. provide evidence to this • - ; : ' • ~. <br />olTtce that the water is peztnitted or decreed for such use. If this water tight is not,decreed Cur 5uch,use,-the .~.:: -.~ ,. . <br />applicant will need to apply to the Division 4 Water Court for a change of waterrghi,prior.to using;the subject ~ ,. <br />water in this manner. . _ . ,r, ' <br />^ Other: <br />