Laserfiche WebLink
~ 111 lllllllllllll 111 r <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />th •hdrI11L`III OI NJIULII {Zc~UOrc!•) <br />I { 14 tiLrvnndn $L, hnnm ' I S <br />Dcnrr~i. Cnlnrad~t I40'0 S <br />Nhun~•:I S11 )I t1Llr 1ih: <br />Fns nngluL~iunn <br />June l0, 1999 <br />DIVI]ION OF <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MINING•SAfETY <br />ddl O~..en. <br />GOBI P.f Ih)f <br />G«s E. lVah h•,i <br />Mr. Luis M. Vasquez E~ecwire D~reuor <br />P.~. BOx 122 hlich~el d. LnnG <br />Lyons, CO 80540 Drvleinn Di,caar <br />Re: Lyon King Quarry, File No. M-99-064, Receipt of Additional Materials for Your 110 Construction <br />Materials Reclamation Permit Application Package <br />Dear Mr. Vasquez: <br />On June 9, 1999, dte Division of Minerals and Geology received additional materials for your 110 Construction <br />Materials Reclamation Permit Application package for the Lyon King Quarry, File No. M-99-064. Preliminary <br />review of the information received determined that the following items must be received before the Division can <br />consider your application as being submitted and technical review can begin: <br />EXHIBIT B -Site Description (Rule 6.3.2(a)l: You must address Item (a) to the extent necessary to <br />demonstrate compliance with the apphcable performance standard requirements of Rule 3. At a minimum, <br />you must include a description of dte soil chazacteristics in the area of the proposed operation. The local <br />office of the Natural Resources Conservation Service (NRCS) may provide you with this information as <br />well as recommendations for Exhibit D -Reclamation Plan; <br />EXHIBIT J -Proof of Mailing Notices of Permit Application (Rule 6.3.101: Include proof of mailings <br />of the "Notice of Permit Application" sent to the Board of Supervisors of the Big Thompson Soil <br />Conservation District, in the application, by submitting the date-stamped receipt for Certified Mailing or <br />adate-stamped copy of the notice form with signature acknowledging personal service and receipt by the <br />appropriate board. Also, refer to Rule 1.6.2(1)(a). <br />Your application will not be considered filed until the information listed above is received and found sufficient to <br />begin our review. A decision date will be established 30 days from the date of receipt of all of the requested <br />inforration. Addidooally, if you have already published notice you will need to republish notice, after the Division <br />considers the application submitted. Republication must occur once within ten (10) days of the submittal date. <br />We will notify you when you should initiate republication of your notice. The final date for receiving comments <br />is ten (10) days after the date of publication or the next regular business day. <br />This letter shall not be construed to mean that there are no other technical deficiencies in your application. The <br />Division will review your application to determine whether it is adequate to meet the requirements of the Act after <br />submittal of all required items. <br />Sincerely, <br />J. <br />Suzt E I sen <br />Program Assistant <br />