Laserfiche WebLink
STATE OF COLORADO <br />• COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT op ~ <br />~~ <br />AIR POLLUTION CONTROL DIVISION <br />TELEPHONE: (303) 692-3150 t <br />t <br />• ~s~e <br />CONSTRUCTION PERMIT <br />PERMIT No: 96DL703-7F <br />INITIAL APPROVAL <br />DATE ISSUED: AIIGOST 6, 1999 <br />ISSUED TO: BOWIE RESOURCES LIMITED <br />THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: <br />Underground coal mine, Bowie No. 2, located 3 miles northeast of Paonia, Dalta County, <br />Colorado. <br />THE SPECIFIC EQUIPMENT OR ACTIVITY SUBJECT TO THIS PERMIT INCLUDES THE FOLLOWING: <br />Above ground fugitive emission producing activities such es stockpiling, on-site hauling, <br />• site preparation, etc.; non-fugitive emissions from conveyors and transfer points. <br />THIS PERMIT IS GRANTED SUBJECT TO ALL RULES AND REGULATIONS OF THE COLORADO AIR <br />QUALfTY CONTROL COMMISSION AND THE COLORADO AIR POLLUTION PREVENTION AND CONTROL <br />ACT C.R.S. (25-7-101 at seal, TO THOSE GENERAL TERMS AND CONDITIONS SET FORTH ON THE <br />REVERSE SIDE OF THIS DOCUMENT AND THE FOLLOWING SPECIFIC TERMS AND CONDITIONS: <br />The particulate emission control measures listed on the attached page (as approved by the Division) <br />shall be applied to the particulate emission producing sources as required by Regulation No. 1, <br />Section III.D.t.b. <br />2. The permit number shall be marked on the subject equipment for ease of identification. (Reference: <br />Reg. 3, Part B, IV.E.) (State only enforceable) <br />3. Transfer points shall be partially enclosed to control particulate emissions. <br />4. This source shall be limited to a maximum processing rate as listed below and all other activities, <br />operational rates and numbers of equipment as stated in the application. Monthly records of the <br />actual processing rate shall be maintained by the applicant and made available to the Division for <br />inspection upon request. (Reference: Regulation 3, Part B,III.A.4) <br />Processing of coal shall not exceed 20,000 tons per day, 416,667 tons per month, and 5,000,000 <br />tons per year. <br />During the first twelve (12) months of operation, compliance with bath the monthly and yearly <br />production limitations shall be required. After the first twelve (12) months of operation, compliance <br />. with only the yearly limitation shall be required. Compliance with the yearly production limits sha{I <br />be determined on a rolling twelve (12) month total. <br />29/49/7 <br />