Laserfiche WebLink
BOWIE RESOURCES LIMITED <br />Permit No. 96DL703-6 <br />Initial Approval <br />Page 3 <br />This source is subject to New Source Performance Standards requirements of Regulation No. fi, <br />Part A, Subpart Y, Standards of Performance for Coal Preparation Plants as follows: <br />Visible emissions shall be less than 20% opacity. <br />b. EPA Method 9 shall be used to measure opacity. <br />In addition, the following requirements of Regulation No. 6, Part A, Subpart A, General Provision::, <br />apply. <br />No article, machine, equipment or process shall be used to conceal an emission <br />which would otherwise constitute a violation of an applicable standard. Such <br />concealment includes, but is not limited to, the use of gaseous diluents to achieve <br />compliance with an opacity standard or with a standard which is based on the <br />concentration of a pollutant in the gases discharged to the atmosphere, (§ 60.12) <br />b. Written notification of construction and initial startup dates shall be submitted to <br />the Division as required under § 60.7. <br />• <br />c. Records of startups, shutdowns, and malfunctions shall be maintained, as required <br />under § 60.7. • <br />d. Written notification of opacity observation or monitor demonstrations shall be <br />submitted to the Division es required under 4 60.7. <br />e. Compliance with opacity standards shall be demonstrated according to § 60.11. <br />At all times, including periods of start-up, shutdown, and malfunction, the facility <br />and control equipment shall, to the extent practicable, be maintained and operated <br />in a manner consistent with goad air pollution control practices for minimizing <br />emissions. Determination of whether or not acceptable operating and maintenance <br />procedures are being used will be based on information available to the Division, <br />which may include, but is not limited to, monitoring results, opacity observations, <br />review of operating and maintenance procedures, and inspection of the sources. <br />(Reference: Regulation 6, Part A. General Provisions from 40CFR60.1 1) <br />All previous versions of this permit are canceled upon issuance of this permit. <br />Prior to final approval being issued, the applicant shall submit to the Division for approval tm <br />operating and maintenance plan for all control equipment and control practices, and a proposed <br />record keeping format that will outline how the applicant will maintain compliance on an ongoing <br />basis with the requirements of condition numbers 2, 3, and 6 listed above. (Reference: Reg. 3, <br />Part B,IV.B.2) <br />• <br />29/49/6 <br />