Laserfiche WebLink
STATE OF COLORADO <br />• COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT ap~~ <br />AIR POLLUTION CONTROL DIVISION Mid <br />TELEPHONE: (303) 692-3150 <br />• rays <br />CONSTRUCTION PERMIT <br />PERMIT No: 96DL703-1 <br />INITIAL APPROVAL <br />DATE ISSUED: AIIGIIST 6, 1999 Modification 2 <br />ISSUED TO: BOWIE RESOURCES LIMITED <br />THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: <br />Coal mine (underground, known as Bowie No. 2) and coal processing facility located in <br />T7 3S, R91 W, 3 miles northeast of Paonia, Delta County, Colorado. <br />THE SPECIFIC EQUIPMENT OR ACTIVITY SUBJECT TO THIS PERMIT INCLUDES THE FOLLOWING: <br />One 11) -Allis Minerals System screen rated et 1500 tons per hour, serial number <br />• 09KA09493; equipped with spray bars for control of particulate emissions. <br />THIS PERMIT IS GRANTED SUBJECT TO ALL RULES AND REGULATIONS OF THE COLORADO AIR <br />QUALITY CONTROL COMMISSION AND THE COLORADO AIR POLLUTION PREVENTION AND CONTROL <br />ACT C.R.S. (25-7-101 et sea-, TO THOSE GENERAL TERMS AND CONDITIONS SET FORTH ON THE <br />REVERSE SIDE OF THIS DOCUMENT AND THE FOLLOWING SPECIFIC TERMS AND CONDITIONS: <br />This permit is for the process unit described above; it is not extended to any other equipment. Any <br />substitution/replacement of the equipment as described above constitutes a violation of this permit. <br />A revised Air Pollution Emission Notice (APEN) must be submitted prior to any separation, <br />substitutions, replacements, or additions. <br />2. This source shall be limited to a maximum processing rate as listed below and all other activities, <br />operational rates and numbers of equipment as stated in the application. Monthly records of the <br />actual producessing rate shall be maintained by the applicant and made available to the Division <br />for inspection upon request. (Reference: Regulation 3, Part B,III.A.4) <br />Screening of coal shall not exceed 36,000 tons per day or 416,667 tons per month or 5,000,000 <br />tons per year. <br />During the first twelve (12) months of operation, compliance with both the monthly and yearly <br />production limitations shall be required. After the first twelve (121 months of operation, compliance <br />with only the yearly limitation shall be required. Compliance with the yearly production limits shall <br />be determined on a rolling twelve (12) month total. <br />• <br />29/49/1 <br />