Laserfiche WebLink
Q <br />STATE OF COLORADO <br />OFFICE OF THE STATE FNGINFER <br />Division of Water Resources <br />Department of Natural Resources <br />1373 Sherman Stree4 Room 818 <br />Denver, Colorado 80203 <br />Phone (303) 8663581 <br />FAX (303) 866-3589 <br />WW W.Wd[er.StdtE.C0.U5 <br />Response to Reclamation Permit Application Consideration <br />DATE: January 29, 2003 <br />ti`'OF c~k <br />re <br />N <br />f } <br />r 1676 s <br />Bill Owens <br />Govemar <br />Greg E. Walther <br />Executive Director <br />Hal D. Simpson, P.E. <br />State Engineer <br />TO: Harry H. Posey, Senior Environmental Protection Specialist <br />CC; Division 2 Office; Dis ct 13 Water Commissioner <br />FROM: Don West, P.E. ~~ <br />RE: Boyer Pit, File No. M-2002-122 <br />Operator: Seifert Construction, <br />Contact: Jerald A. Seifert 719/783-2757 <br />Section 5, Twp 24 S. , Rng 71 W. , 6th P.M., Custer County <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />® The proposed operation will consume ground water by: ^ evaporation, ^ dust control, ^ <br />reclamation, ^ water removed in the mined product, ®processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />-- - - - - - - - - -or other-type of v~`ell Jlermrt, as-aPplieable:-however, priorttr abtainmg a Permit atr appro~'ed-water- - - <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />® Other: Applicant states that stormwater will be contained on-site. All ponded stormwater must be <br />released to the natural stream system within 72 hours, or all work must cease until a substitute water <br />supply plan, or augmentation plan approved by water court, is obtained. <br />COMMENTS: <br />