Laserfiche WebLink
• SPur.1a1 Stipulations <br />Attached to Departmental Approval of Modification of <br />Coal Mining and R.:clamation Plan <br />Hawk's Nest Mine, Crrnnison Co,ictty, Color~,l„ for Proposed Mining <br />Federal Coal Lease :Jo, C-27 U)3 <br />1. Western Slope Carbon must monitor. ground water inflow into the extension <br />of the 1st East Mains artd submit to•[l,e regulat~~r; ,-,i,:i,ur!ty monthly reports <br />on :he quantity and q,~a;ity of water entering [he mine. The report should <br />also include informat.ioct on [he urientar.ic„i acrd dzgree of fracturing in [he <br />"E' seam and the roof and floor rock. the frequency of reporting may be <br />adjusted only if appr,~vr,i 1iy [l,e r~•;;::1,r.~ry authority. If ground water inflow <br />exceeds five gpm the regulatory authorities muir. ~~ notified immediately. <br />:. (a) The East `tine sediment pond must be designed to totally contain the <br />runoff from a 10-year, 24-hour storm (0.55 acre-ieet); unless WSC can <br />demunscrate to the Regulatory Authority that a modification of the proposed <br />system will comply with [Ile. requiremecits of 7i5.17(e). The required storage <br />volume (0.55 acre-fee[) does no[ include sedimcr,t s_orage because runoff and <br />sediment will be immediately pumped from the pond as proposed by WSC. A <br />sediment pond design, acceptable to the Regulatory Authority, and certified by <br />, ~;~..,litEird registered professional engtr,eer musc.be submitted within two <br />.,eels of the approval. <br />• (b) WSC must provide a demonstration rii;,[ tF.e diversion structures above <br />ifre mine are adequate to convey water ;tom undisturbed areas aroucid [he _ast <br />'ti n~ surface facilities. If [he divers!. c,n struct gyres are f~ccd inadequ :te, <br />cnr .Iiv,~r;i.ons oust be redesigned, to [he satisfy:tion of the regulatory <br />autt,oricy, and design revisions impli o~a-.•i i.ir~l,l-.:;.;•. Ti,e r~c~;~,i.red <br />demonstration oust Se c.~rri.fie~( 'ry a q,~alified registered professional <br />engineer, and submitted within Cwo w,~ekc of tfris approval. <br />3. WSC must complete within 3U days, a subsidence control plan, pursuant to <br />,d CFR 784.20(a),(b),(c), and (d~, providing detailed descriptions us therein <br />prescuG_~l. If this subsidence plan is not acepted by the regulatory authurt'_y <br />ur .s incomplete, the permit to mine will be rev.~;,~,1. <br />4. WSC must submit, wfrl,in JO ,Lrys, a noni[orlnq ar,d sediment removal plan <br />and schedule, acceptable to [he the regulatory authority, for the removal.,of <br />accum,cl.a[ed sediment from sump A. <br />5. WSC must have the underground w:,:t,~ •!isl,usal system. operational within 9 <br />months of this approval. Any d.vi.,[;,,~, f,.,, ~.!~.;; schedule must be approved by <br />the regulatory authority. <br />G. All Ei~;dings and stipulations resulting; from the subsequent analysis ..f <br />the en[i[e East Lease permit application under the permanent regulatnn• <br />prol,ram must be retroactive to the current mLiim~ ~xtnn5lon. <br />• <br />..u ~.. ~. ~ .. <br />...:. <br />... _ ... .. L. <br />.~. <br />