Laserfiche WebLink
• • • <br />R ~2 Mlne -Earthwork Calculations <br />Section Dlatance Cut Area FIII Area BCY Cut Cum. <br />BCY Cut gCY FIII Cum. <br />BCY FIII Tons Coal Cum.Ton <br />Coal <br />0+00 0 <br />50 3,208 3,208 0 0 453 453 <br />0+50 3,485 <br />50 6,569 9,777 0 0 953 1,405 <br />1+00 3,630 <br />50 6,796 16,573 0 0 1,020 2,425 <br />1+50 3,710 <br />50 7,120 23,693 0 0 1,080 3,485 <br />2+00 3, 980 <br />50 3,685 27,378 0 0 540 4,025 <br />2+50 0 <br />Swell (~ 25.096 6,845 <br />Total Cubic Yards 34,223 <br />Excess Material BCY 34,223 <br />