• •
<br /> Pi/P2 M ine -Earthwork Calculations
<br />Section Dista nce Cut Area Fill Area BCY Cut Cum. BCY Fill Cum. Tons Coal Cum.Ton
<br /> BCY Cut BCY Fill Coal
<br />4+00 38,870 0
<br /> 50 89,685 260,546 0 41,090 2,915 4,540
<br />4+50 57,990 0
<br /> 50 102,120 362,666 0 41,090 4,335 8,875
<br />5+00 52,300 0
<br /> 50 85, 352 448, 018 0 41, 090 3, 675 12, 550
<br />5+50 39,880 0
<br /> 50 62,731 510,749 0 41,090 2,675 15,225
<br />6+00 27,870 0
<br /> 50 41,222 551,971 0 41,090 1,665 16,890
<br />6+50 16,650 0
<br /> 50 19, 787 571, 758 0 41, 090 660 17, 550
<br />7+00 4,720 0
<br /> 50 4,796 576,554 0 41,090 80 17,630
<br />7+50 460 0
<br /> 50 426 576,980 0 41,090 0 17,630
<br />8+00 0 0
<br />Box Cut Volume 576,980
<br />Coal Removed 17,630
<br />Total BCY 559,350
<br />Swell ~ 20.0°~ 111,870
<br />Total Cubic Yards 671,220
<br />North Fill Area 41,090
<br />South Fill Area 630,130
<br />2 i v1 sirs
<br />
|