My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE129617
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE129617
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:30:38 PM
Creation date
11/25/2007 7:56:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X198515909
IBM Index Class Name
Permit File
Doc Date
7/17/1985
Doc Name
NOI APP - HART SYNCLINE FEDERAL COAL EXPLORATION LICENSE C-40288
From
GETTY
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All drill sites will be located next to existing roads and <br />trails, where possible. If necessary, a bulldozer will be used to <br />construct a level bench for the drill. In those cases where level bench <br />construction is necessary, for reclamation purposes, topsoil will be <br />removed from the drill site leveling locations, stored, and replaced during <br />road reclamation. Until redistribution, the topsoil will be separated, <br />stock-piled, and protected from wind and water erosion and from <br />contaminants which lessen its capability to support vegetation. <br />Existing roads and trails will be utilized wherever possible, and <br />movement by equipment across undisturbed terrain will be kept to a minimum. <br />If existing roads or trails are disturbed by the proposed exploration <br />activities, they will be bladed and returned to a condition equal to or <br />better than their condition prior to commencement of the proposed <br />exploration activities. New or additional roads will be constructed only <br />when necessary and only immediately prior to the drilling operations. At <br />the conclusion of the proposed exploration activities, all new roads <br />constructed by Getty will be reclaimed. All roads in the proposed <br />exploration area will have water bars and/or culverts installed, if <br />necessary, to prevent excessive erosion. <br />Fire protection will be maintained by keeping all trash and <br />debris from accumulating. Adequate fire extinguishers will be maintained <br />and available at each drilling site. <br />The possibility of contamination of surface waters by drilling <br />materials is extremely low, adequate precautionary measures to prevent the <br />escape of drilling materials into stream drainages can be incorporated into <br />individual site designs. The potential for contamination of surface waters <br />can be minimized by constructing waste pits of sufficient size, to contain <br />all effluent drilling materials. Waste pits will be lined if percolation <br />of fluids through the walls into stream drainages appears probable. <br />-11- <br />
The URL can be used to link to this page
Your browser does not support the video tag.