Laserfiche WebLink
RN~i SYNCLINE <br />L•JORK PLAN FOR 1985 <br />June July Aug <br />Literature Review X X <br />Trip Preparation X X <br />Well Drilling and Completion X X <br />Water Level Measurements X <br />Water-Quality Sampling (SW-GW) <br />Pumping Tests <br />Data Reduction, X <br />Computer Filing <br />Initial Data Compilation <br />Installation of Stream Gaging Stations X <br />WORK PLAN FOR 1986 <br />Visits to study area will be made every 4 to 6 weeks. Water-level <br />measurements, surface-water discharge measurements and water-quality <br />sampling will be done during the site visits. Each visit will take <br />one week or less. Extra visits will be made during high water in the <br />spring and for repair of equipment if necessary. <br />Literature review, data reduction, analysis an d interpretation <br />and report preparation will be ongoing activities d uring the year. <br />Sept <br />X <br />X <br />X <br />x <br />X <br />