Laserfiche WebLink
2. Describe what and where reclamation activities have occurred in the past 180 days. <br />Mention sealing and plugging, regrading, retopsoiling and reseeding activities. (Attach <br />additional pages, if needed.) <br />See attached <br />3. List any additional changes to the original prospecting and reclamation plan or any <br />unexpected problems (such as unexpected water or artesian conditions <br />encountered). (Attach additional pages, if needed.) <br />No changes were made to the original plan. No unexpected conditions <br />were encountered. <br />4. When do you expect to complete all exploration and reclamation activities for this <br />project? Reclamation was completed on 10/21/06. <br />5. Does the prospector wish this report to be considered confidential? See Rule 2.02.7(2). <br />No If yes, attach a justification for the request. <br />6. Additional Comments: (See attached) <br />Date: Z 7 0 7 ~, V `~L <br />Signa e of uthorized Representative <br />Company <br />(I1/01) <br />