Laserfiche WebLink
<br />• <br />• <br />TABLE OF CONTENTS <br />INTRODUCTION .............................................................................................................iv <br />APPLICABLE WEQA STATUTES AND LQD RULES AND REGULATIONS ...............iv <br />COST EXPLANATION FOR ITEMS USED IN STANDARDIZED RECLAMATION <br />BOND COSTS ......................................................................................................1 <br />Table D-1. Operating Costs and Adjusted Costs ($/Hour w/o Operator) For <br />Equipment in This Standardized Bond Format .......................................... 2 <br />Table D-1 a. Purchase Price, Lease Cost, and Operating Costs for 58 CY <br />Electric Shovel and 793C Trucks ............................................................... 3 <br />Table D-2. Abbreviations Used in This Standardized Bond Format ..................4 <br />II. STANDARDIZED RECLAMATION BOND FORMAT .............................................. ..4 <br />A. Area Bond ................................................................................................ ..4 <br />1. Introduction ................................................................................... ..4 <br />2. Backfill ........................................................................................... ..4 <br />3. Rough Grade Backfill .................................................................... ..5 <br />4. Final Grade Backfill ....................................................................... ..5 <br />B. Incremental Bond ..................................................................................... .. 5 <br />1. Introduction ................................................................................... .. 5 <br />2. Native Topsoil Removal From Borrow and/or Backslope Areas.... ..5 <br />3. Native Overburden Removal From Borrow and/or Backslope Areas <br /> ...................................................................................................... .. 5 <br />4. Miscellaneous Overburden Redistribution ..................................... ..5 <br />5. Demolition ..................................................................................... .. 6 <br />6. Removal of Monitoring Structures and Other Miscellaneous Items. 6 <br />7. Scarification or Ripping of All Compacted Surfaces ...................... .. 7 <br />8. Topsoil Redistribution on All Disturbed Areas ............................... ..7 <br />9. Revegetation of All Disturbed Areas ............................................. .. 7 <br />10. Reclamation Status and Bond Liability Status of All Lands Within <br /> the Permit Area ............................................................................. .. 7 <br /> a. Land Status Categories ...................................................... ..7 <br /> b. Line Item Bond Costs ......................................................... ..8 <br />11. Coal Drilling ................................................................................... 11 <br />12. Miscellaneous Items ...................................................................... 11 <br />13. Unknown Costs ............................................................................. 13 <br />14. References .................................................................................... 13 <br />15. Maps ............................................................................................. 13 <br />III. APPENDICES ........................................ <br />Appendix A ........................................ <br />Appendix B ........................................ <br />Appendix C ........................................ <br />Appendix D ........................................ <br />A endix E <br />................................................................. 14 <br />.................................................................15 <br />.................................................................18 <br />PP .................................................................................................. <br />...... 21 <br />...... 24 <br />...... 26 <br />DE 10/2005 <br />