Laserfiche WebLink
<br /> <br />Activity Quantity Units Unit Cost Cost <br />J. Equipment mobiliza[ion/demobilization <br />Equipment used to reclaim the site: I D9, <br />I scraper and 1 loader <br />I. Remove concrete pad for wash plant 74 yards $3/yard $222 <br />2. Remove concrete pad for asphalt plant 160 yards $3/yard $480 <br />3. Demolish and remove shop I LS $5,000 $5,000 <br />4. Remove concrete footings for office 20 yards $3/yard $60 <br />5. Remove spill control berm and liner 1 LS $1,500 $1,500 <br />Total of Disturbance Costs $504,380 <br />Contractor Mobilization (l0%) $50,438 <br />Overhead (15%) $75,657 <br />Administration (5%) $25,219 <br />Total $655,694 <br />Disturbed acreage - 65 acres <br />Financial warranty per acre - $9,067 <br />