Laserfiche WebLink
~ ~ iii iiiiiiiiiiiii iii <br />Exhibit E - Reclamation Plan <br />`j F7 <br />The anticipated post mining land use will be grassland. At the <br />• completion of mining all slopes will be graded to no steeper <br />than 3:1 and contoured to reflect the natural terrain of the <br />area. There will be approximately 6" of topsoil placed on the <br />affected area. Final grading will be approved by the Materials <br />Engineer prior to seeding. <br />The area will be sloped subsequent to the completion of the mining <br />operation for the project. Less than 10 days will be required <br />for grading. The haul road out of pit area is a permanent access <br />road used in the care of cattle. <br />See attached seeding and fertilizing plan from Tom Wiley Smith. <br /> <br /> <br />