My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-01-31_PERMIT FILE - M2002046
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2002046
>
2003-01-31_PERMIT FILE - M2002046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 2:18:47 PM
Creation date
11/25/2007 7:37:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002046
IBM Index Class Name
Permit File
Doc Date
1/31/2003
Doc Name
Preliminary Adequacy Review
From
DMG
To
Ephemeral Resources Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatin4 Software <br />PROJECT IDENTIFICATION <br />Task # : 04a <br />Date : 01/30/2003 <br />User : GRM <br />State :Colorado <br />County :Mesa <br />Site :D Road Gravel Pit <br />Permitlob # : M-2002-046 <br />Abbreviation :none <br />Filename : M046-04a <br />Agency or organization name : DMG <br />Permit or other job action :final reclamation costs e; <br />Task description :final grade of topsoil <br />HOURLY EQUIPMENT COST <br />Basic machine :CAT 120H <br />Horsepower: 125 <br />Attachment no. 1 : NA <br />Attachment no. 2 : Multi-shank <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown Ownership cosUhour : $15.84 NA <br />Grader operating cosUhour : $20.21 100 <br />Ripper operating cost hour : $0.00 0 <br />Operator cost/hour : $30.65 NA <br />Total unit cest/hour : $66.70 Total fleet cosUhour : $88.70 <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 13.80 acres <br />Source of estimated acreage :aceamge of area A" <br />HOURLY PRODUCTION <br />Selected application :Finish grading (0-2.5 mph) <br />Average grader speed : 1.25 mph <br />Selected blade angle : 0 degrees " <br />Effective blade length : 12.00 feet <br />Width of blade ovedap per pass : 2.00 feet <br />Net grading or ripping width per pass : 10.00 feet " <br />Unadjustetl hourly unit production : 1.5152 acres hour <br />at 0 tlegrees, blade is perpentlicular <br />to direction or travel. <br />"width of upper beam on ripping applications <br />Job Condition Correction Factors Source <br />Average site altitude : 4,600 feet Altitude adjustment factor : 1.00 (Cat HB) <br />Job efficiency adjustment factor : 0.85 (1sh/d, mod.) <br />Net job correction : 0.8500 multiplier <br />Adjusted hourly unit production : 1.2879 acres/hour <br />Adjusted hourly fleet production : 1.2879 acres/hour <br />JOB TIME AND COST <br />Fleet size <br />Unit cost <br />1 grader(s) <br />$51.7g per acre <br />Total job time <br />Total job cost <br />10.72 hours <br />$715 <br />
The URL can be used to link to this page
Your browser does not support the video tag.